ARE 5.0 Construction & Evaluation UPDATED ACTUAL Exam Questions and CORRECT Answers Competitive bid - CORRECT ANSWER - Can be public or private and involves more than 1 contractor Negotiated Bid - CORRECT ANSWER - For privately funded projects, Owner and Architect work with 1 GC to reach a price

Show more Read less
Institution
ARE 5.0
Course
ARE 5.0










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ARE 5.0
Course
ARE 5.0

Document information

Uploaded on
January 30, 2025
Number of pages
28
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • are 50
  • are

Content preview

ARE 5.0 Construction & Evaluation
UPDATED ACTUAL Exam Questions and
CORRECT Answers
Competitive bid - CORRECT ANSWER - Can be public or private and involves more than 1
contractor


Negotiated Bid - CORRECT ANSWER - For privately funded projects, Owner and Architect
work with 1 GC to reach a price


Why would an Owner hire a Construction Manager as Adviser (CMa)? - CORRECT
ANSWER - To assist in project delivery by providing cost estimating, scheduling, and
construction contract management services to the Owner


Which project delivery limits the role and responsibilities of the Architect during
preconstruction? - CORRECT ANSWER - IPD



Who is responsible for cost control in design-build delivery? - CORRECT ANSWER - The
GC (Architect is responsible for controlling cost of design services)


Who must approve a proposed substitution? If approved, what is done with the proposal? -
CORRECT ANSWER - Architect. If approved, it becomes an addendum to be included in the
bid documents


Who is the only party who guarantees by contract all construction costs? - CORRECT
ANSWER - GC


At a public hearing, which two items are announced by the Architect after each bid is opened? -
CORRECT ANSWER - - Bid amount
- Whether bidder has submitted the required supporting documentation

,According to B101 (O+A), what form of dispute resolution must be tried before arbitration? -
CORRECT ANSWER - Mediation


What other construction delivery method is most similar to the Construction Manager as
Constructor (CMc) with regard to the many roles and responsibilities of the Architect? -
CORRECT ANSWER - Design-Bid-Build


During agency review, what is the Architect's role in an IPD project? - CORRECT
ANSWER - Working with AHJ to show code compliance related to the BIM model



What is the purpose of the Architect's site observation? - CORRECT ANSWER - - Becoming
generally familiar w/ progress and quality of the work & to keep Owner informed
- Endeavoring to guard Owner against defects and deficiencies in the work
- Determining if the work is progressing in such a way that it will be in accordance w/ CDs when
completed


What is the Architect not responsible for during the construction of the project? - CORRECT
ANSWER - - Exhaustive or continuous on-site inspections
- Means and methods of construction
- Site safety


Who pays for additional field testing if the work does not conform with the contract documents?
- CORRECT ANSWER - GC pays to correct the work, subsequent testing, and compensation
for Architect's services related to the issue


During construction, why must the Architect speak directly to the GC and not the
subcontractors? - CORRECT ANSWER - Architect is an agent of the Owner who does not
have a contractual relationship with subcontractors


Which document defines the lines of communication among parties during CA? - CORRECT
ANSWER - A201 - General Conditions of the Contract for Construction

, Through whom must the owner and GC communicate during CA? - CORRECT ANSWER -
Architect


Who will pay for work to be uncovered when the work was covered contrary to the architect's
request? - CORRECT ANSWER - GC


If uncovered work is determined to meet project requirements, and the architect had not
previously requested that it remain uncovered, who pays to uncover and replace the work? -
CORRECT ANSWER - Owner



Special Inspections - CORRECT ANSWER - Required by Ch. 17 IBC, verifies that work is
being performed in accordance with AHJ-approved plans and specifications (ex. pre-fab items,
steel, concrete, spray-fireproofing)


Who prepares the Statement of Special Inspections? - CORRECT ANSWER - Architect
develops, then submits to AHJ officials for review and approval; Owner must hire and pay an
independent (not GC) firm to do the inspection work; results are submitted to code officials for
approval


Pre-Construction Conference - CORRECT ANSWER - Organized by Architect; provides
design and construction team members with an understanding of project procedures,
requirements, due dates, and special characteristics


How is "contract time" defined? - CORRECT ANSWER - Starts at date established in the
agreement and ends at Substantial Completion


Which party has sole responsibility for the means and methods of construction? - CORRECT
ANSWER - GC


What two parties should each receive a copy of an Architect's field reports? - CORRECT
ANSWER - Owner and GC

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1053
Member since
1 year
Number of followers
100
Documents
68976
Last sold
3 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reviews

5
72
4
30
3
42
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions