100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

OPERATION MANAGEMENT (Economic Finance) EXAM 3 REVISION STUDY QUIZBANK CORRECTLY ANSWERED AND 100% VERIFIED.

Rating
-
Sold
-
Pages
49
Uploaded on
29-01-2025
Written in
2024/2025

OPERATION MANAGEMENT (Economic Finance) EXAM 3 REVISION STUDY QUIZBANK CORRECTLY ANSWERED AND 100% VERIFIED.

Institution
OPERATION MANAGEMENT
Course
OPERATION MANAGEMENT











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
OPERATION MANAGEMENT
Course
OPERATION MANAGEMENT

Document information

Uploaded on
January 29, 2025
Number of pages
49
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

OPERATION MANAGEMENT (Economic
Finance) EXAM 3 REVISION STUDY QUIZBANK
CORRECTLY ANSWERED AND 100% VERIFIED.
The aggregate operations plan translates annual and quarterly business plans
into broad labor and output plans for the intermediate term of 3 to 18 months.
TRUE
Some degree of variability is present in almost all processes.
True
Mistakes stemming from workers' inadequate training represent an assignable
cause of variation.
True
Averages of small samples, not individual measurements, are generally used in
statistical process
control.
True
The Central Limit Theorem states that when the sample size increases, the
distribution of the
sample means will approach the normal distribution.
True
In statistical process control, the range often substitutes for the standard
deviation.
True
A process range chart illustrates the amount of variation within the samples.
True

,Mean charts and range charts complement one another, one detecting shifts in
process average, the
other detecting shifts in process dispersion.
True
The higher the process capability ratio, the greater the likelihood that process will
be within design
specifications.
True
The Cpk index measures the difference between desired and actual dimensions
of goods or services
produced.
True
Acceptance sampling accepts or rejects an entire lot based on the information
contained in the
sample.
True
In acceptance sampling, a manager can reach the wrong conclusion if the sample
is not
representative of the population it was drawn from.
True
The steeper an OC curve, the better it discriminates between good and bad lots.
True
If a sample of items is taken and the mean of the sample is outside the control
limits the process is:

a. out of control and the cause should be established

b. in control, but not capable of producing within the established control limits

,c. within the established control limits with only natural causes of variation

d. monitored closely to see if the next sample mean will also fall outside the
control limits

e. producing high quality products
A. out of control and the cause should be established.
The causes of variation in statistical process control are:

a. cycles, trends, seasonality, and random variations

b. producer's causes and consumer's causes

c. mean and range

d. natural causes and assignable causes

e. Type I and Type II
D. natural & assignable causes
Natural variations:

a. affect almost every production process

b. are the many sources of variation that occur when a process is under control

c. when grouped, form a pattern, or distribution

d. are tolerated, within limits, when a process is under control

e. All of the above are true.

, E. ALL THE ABOVE
Natural variations:

a. are variations that are to be identified and eliminated

b. are variations that can be traced to a specific cause

c. are the same as assignable variations

d. lead to occasional false findings that processes are out of control

e. play no role in statistical process control
D. Natural variations lead to occasional false finding that processes are out of
control.
Assignable variation:

a. is a sign that a process is under control

b. is to be identified and eliminated

c. is the same as random variation

d. is variation that cannot be traced to a specific cause

e. leads to a steep OC curve
D. Assignable Variation is variation that cannot be traced to a specific cause.
Assignable causes:

a. are not as important as natural causes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
saraciousstuvia WALDEN UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
560
Member since
3 year
Number of followers
380
Documents
11349
Last sold
6 days ago
BRIGHTEST IDEAS EDUCATIONAL WORLD

Welcome to the best educational world with the brightest,amazing and all complete study materials. I wish you great,easy learning and success through out your course. Kindly message me if you cant find your tutorials

4.0

114 reviews

5
61
4
20
3
17
2
3
1
13

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions