100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CON 1300 PRACTICE EXAM REVIEW QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
26-01-2025
Written in
2024/2025

CON 1300 PRACTICE EXAM REVIEW QUESTIONS AND ANSWERS

Institution
CON 1300
Course
CON 1300









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 1300
Course
CON 1300

Document information

Uploaded on
January 26, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CON 1300 PRACTICE EXAM REVIEW
QUESTIONS AND ANSWERS
What is schedule element risk - ANSWER-Is risk that activities will take longer than
expected, & is typically the result of poor planning or unforeseen circumstances

What is performance risk elements - ANSWER-Is the risk that the project will fail to
produce results consistent with project specifications

What is Cost Realism Analysis used for? - ANSWER-Used to mitigate cost risk

According to FAR 16.101, contract types vary according to what two elements -
ANSWER-o The degree & timing of the responsibility assumed by the contractor for the
cost of performance

o The amount & nature of the profit incentive offered to the contractor for achieving or
exceeding specified standards or goals

What is the objective of proposal Analysis - ANSWER-The objective of proposal
analysis is to ensure that the final agreed to price is fair and reasonable.

Who is responsible for evaluating the reasonableness of the offered prices - ANSWER-
The KO is responsible for evaluating the reasonableness of the offered price

What is proposal Analysis - ANSWER-While the FAR does not define what constitutes a
fair & reasonable price, it does establish specific steps we need to take in order to
determine prices proposed as fair & reasonable

What are some proposal analysis techniques - ANSWER-o Price Analysis
o Cost Analysis
o Technical Analysis
o Past Performance

Examples of price- related factors include: - ANSWER-o Multiple Awards vs. Single
Award
o Govt. Furnished Property
o Buy American Act

what is cost analysis - ANSWER-o Shall be used when certified cost & pricing data is
required

o Also used when price analysis alone will not suffice to determine price fair &
reasonable

, What is Cost Realism Analysis - ANSWER-Costs should be realistic for the work to be
performed; reflects a clear understanding of the requirements; and is consistent with the
unique methods of performance & materials described in the offerors technical proposal

What is Price Analysis - ANSWER-o Evaluating proposed total price & not the separate
cost elements & profit
o We use price analysis daily when comparing prices
o Shall be used when certified cost or pricing data are not required
o contract award criteria should address all price-related factors that will have a
significant & measurable effect on the total cost of the acquisition

What are two types of factors under price-related factors for Government Furnished
Property (GFP) - ANSWER-o Eliminate Competitive advantage

o Consider government costs or savings related to providing property

What are the 3 additional steps to conclude the price analysis process - ANSWER-o
Determine lowest evaluated price
o Compare offered prices with other prices
o Account for differences

What are the 4 steps in the evaluating & applying price-related factors - ANSWER-1-
Determine solicitation provisions
2- Determine total price offered
3- Evaluate award combinations
4- Make award decision

What are Price-related factors - ANSWER-Affect the proposed price for evaluation
purposed only, the actual proposed price from the contractor is not changed.

HUBZone does what in price related factors - ANSWER-Adds 10% price evaluation
preference (PEP) to all offers except HUBZone small business or otherwise successful
small business

What is the Buy American Act - ANSWER-Requires Federal agencies to procure
domestic materials and products
o Procurement must be intended for public use within the U.S.
o Items to be procured or the materials from which they are manufactured must be
present in the U.S.

The contractor must submit cost & pricing data and certify that it is _____________,
____________, and ______________________. - ANSWER-Current, Complete, and
Accurate

What is the current Threshold and Exemptions under Truth in Negotiation Act (TINA)? -
ANSWER-Threshold 2M

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
247
Member since
2 year
Number of followers
68
Documents
17956
Last sold
17 hours ago

4.0

38 reviews

5
22
4
4
3
6
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions