Control center facilities must have a minimum of how many days of fuel for the backup generator? - ANSWER 5 days If PJM ACE shows overgeneration, actual imports are: - ANSWER Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - ANSWER Master Coordinator

Show more Read less
Institution
PJM Generation
Course
PJM Generation









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation
Course
PJM Generation

Document information

Uploaded on
January 22, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • pjm generation operation

Content preview

PJM Generation Operation Exam 2025
Latest Update
Control center facilities must have a minimum of how many days of fuel for the backup
generator? - ANSWER 5 days

If PJM ACE shows overgeneration, actual imports are: - ANSWER Less than scheduled

Who should a generator contact at PJM to clear an outage ticket? - ANSWER Master
Coordinator

To correct for a slow or fast clock, system frequency schedules are offset by: -
ANSWER +/-.02 Hz

What frequency would PJM set to correct for fast-time error? - ANSWER 59.98Hz

What frequency would PJM set to correct for slow-time error? - ANSWER 60.02Hz

What info is on an instantaneous reserve check? - ANSWER synchronized (regulating
and non-regulating), quick start, secondary and beyond secondary reserves

Generators must provide PJM with a realistic Reactive Capability Curve. This curve
must have no less than __ points, and no more than __ points. - ANSWER No less than
2 and no more than 8 points

A classic indicator of voltage instability is when system voltages change greatly when...
- ANSWER system loads change by a small amount

Above the line of a D-curve... - ANSWER Lagging (pushing VARs). Generators will be
set there during high-load/low voltage conditions.

Below the line of a D-curve... - ANSWER Leading (absorbing VARs). Generators will be
set there during low load/high voltage conditions.

MWs and MVARs have what kind of relationship? - ANSWER Inverse (increase in MW
= decrease in MVARs)

How often do generators need to test reactive power capability? - ANSWER Every 5
years

The computer hardware and software at each control center shall achieve an availability
level of what for those reliability functions directly affect the successful operation of
PJM? - ANSWER 99.95%

, What is EHV? - ANSWER Extra high voltage. Classified as 345kv and above

Any generator that is a PJM generation capacity resource that has an RPM Resource
Commitment: - ANSWER 1. Must submit an offer schedule into the DA market even if it
is self-scheduled or unavailable due to outage
2. Generation capacity resources shall submit:
-A schedule of availability for the next seven days
-May submit non-binding offer prices for the days beyond the next Operating Day

What time period is the Market Participant Bid/Offer Period? - ANSWER 0800-1100

What time are DA Market results posted? - ANSWER 1330

What time period is the re-bid period? - ANSWER 1330-1415

What is the maximum for a generation capacity resource offer? - ANSWER $2000/MWh

What is the cap for price-based offers? - ANSWER Price-based offers will be capped at
the lower of $2000/MWh or the corresponding cost-based offer when costs are above
$1000/MWh
Example:
If a unit's cost is $1500, the price offer can be no higher than $1500

If $800, price offer can be no higher than $1000

If $2200, price offer can be no higher than $2000

What are the real-time data requirements for a Mixed Technology Facility that is directly
connected to PJM transmission and has a Maximum Facility Output of 75MW or
greater, or otherwise is a BES generator? - ANSWER MW and MVAR must be
measured at the high-side of the generator step-up transformer. If the transformer is
modeled in the PJM EMS (e.g., for units 20MW and greater), MW and MVAR must also
be measured at the low-side of the generator step-up transformer

If a unit's commit status is set to Must Run it indicates that the generating unit is... -
ANSWER self-scheduling. The unit must be committed.

When is the DA market rebid period? - ANSWER 1330-1415

Resources that are opted-in to intraday offers may make changes beginning... -
ANSWER at 1830 the previous day up to 65 minutes before the operating hour

What time is the deadline for participants to submit bids and offers in the DA Energy
Market? - ANSWER 1100

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lecchris West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
40
Member since
2 year
Number of followers
15
Documents
3203
Last sold
2 weeks ago
LECCHRIS

3.8

6 reviews

5
2
4
1
3
3
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions