Which of the following balancing control modes is used by PJM under normal operations? - ANSWER Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - ANSWER Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - ANSWER Dynamic Instability

Show more Read less
Institution
Pjm
Course
Pjm










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Pjm
Course
Pjm

Document information

Uploaded on
January 22, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • pjm test
  • pjm

Content preview

PJM Test Questions & Answers 2025
Latest Update
Which of the following balancing control modes is used by PJM under normal
operations? - ANSWER Tie-Line Bias

Which of the following influences does PJM consider when performing their system load
forecast? - ANSWER Weather Conditions & Day of the Week

All of the following are limits that must be submitted to PJM for generating units
EXCEPT:

1. Eco Min
2. Eco Max
3. Emergency Max
4. Dynamic Instability - ANSWER Dynamic Instability

If PJM experienced an event that caused the loss of a 1,000 MW generator, which of
the following would most likely provide the quickest impact to improve the
undegenerating Area Control Area (ACE)?

1. Remedial Action Reserve
2. Synch Reserve
3. Non-Synch Reserve
4. Secondary Reserve - ANSWER Synch Reserve

Your system has experienced an event that caused the frequency to drop below 60.00
Hz, what would be the most likely event that occurred? - ANSWER A generator on your
system tripped offline

How does the PJM dispatcher inform the Members of the PJM regulation
Requirements? - ANSWER All-Call

In order for your generator to quality to supply regulation in the PJM Regulation market,
it must be able to respond and attain its desired output within how many minutes? -
ANSWER 5 minutes

Based on a generator capability curve, in order to maximize the MVAR output of the
generator, it may be necessary to: - ANSWER decrease the MW output of the unit

PJM maintains a regulation quality standard which states that a generator may be
certified to provide regulation only after it achieves three consecutive regulation test
scores of at least - ANSWER 75%

,Which of the following would NOT be a cause for a sudden deviation in the balancing
area ACE?

1. incorrect interchange number
2. loss of a tie-line RTU
3. loss of internal load
4. loss of adjacent control area generation - ANSWER loss of adjacent control area
generation

The primary purpose for the balancing area to have Regulation is to correct for: -
ANSWER small deviations in load

It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit
outages: - ANSWER as soon as practicable

PJM should be made aware of any fuel shortage that a generator may experience.

This information assists in analyzing the resources and reliably operating the system. A
heightened awareness is expected during: - ANSWER extreme hot or cold conditions

Generators are required to obtain PJM approval prior to removing a generating unit from
service.

The only exception is for: - ANSWER injury to personnel will be prevented

Prior to removing a self-scheduled generator from service, the PJM member must first -
ANSWER give PJM the option to takeover the unit for the market

When PJM experiences problems with their primary digital control signal, it sometimes
becomes necessary for companies with the capability, to switch to the back-up signal.

This backup signal is known as: - ANSWER Analog control

When PJM sends cost signals to generators, to provide direction for increasing or
decreasing the facility output, this signal that is sent is known as: - ANSWER Dispatch
Rate

Under normal operating conditions, what is the limit that will provide the lowest output
level of a generating unit? - ANSWER Eco Min

When PJM send out a cost signal to generators to adjust their output, the generating
personnel adjust the output of the unit base on the unit's - ANSWER price or cost curve
incremental

Which eSuite tool is used to maintain individual generator regulation data that is
submitted by PJM members? - ANSWER eMarket

, PJM's ACE configuration is such, that when the ACE is positive (+), it indicates -
ANSWER too much generation

If a generator is self-scheduled, what is the minimum notification time required in order
for the MW output to be adjusted? - ANSWER 20 minutes prior to the change

When corrections are made for the time error and the system scheduled frequency must
be changed to implement the correction, how much is the frequency scheduled adjusted
by? - ANSWER + /- 0.02 Hz

When PJM runs their Regulation test, how long do the tests normally run? - ANSWER
40 minutes

Your system has a 300 MW steam unit, but due to oil deliveries, the on-site fuel supply
is diminishing.

What is the hourly threshold for reporting to PJM that the unit cannot operate at its
maximum capacity due to the fuel limitation? - ANSWER 72 hours

What is the regulation requirement for the PJM balancing area during on-peak hours? -
ANSWER 1.0% of the forecasted peak load

What is the time requirement that a generator that wishes to self-schedule itself must
provide to PJM? - ANSWER 20 minutes

The PJM Peak Period Maintenance season occurs: - ANSWER Between the 24th &
36th Wednesdays of the year

Maintenance outage extensions may be granted provided that the request for an
extension is made - ANSWER Prior to the end of the outage

What is the maximum time limit for the maintenance outages that occur during the PJM
Peak Period Maintenance season? - ANSWER 9 days

Which of the following is NOT a control mode that PJM considers? - ANSWER
Frequency Bias

What are the two NERC control standards that PJM must score at least 100% in order
to be compliant? - ANSWER DCS (Disturbance Control Standard) and CPS1

When PJM activates shared reserves with NPCC, what is the normal ramp of the MW
when the event is activated? - ANSWER 0 minutes

What is the regulation required for operating the PJM balancing area during the
midnight period? - ANSWER 1.0% of the forecasted peak load

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lecchris West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
40
Member since
2 year
Number of followers
15
Documents
3203
Last sold
2 weeks ago
LECCHRIS

3.8

6 reviews

5
2
4
1
3
3
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions