100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ADMINISTRATION LESION 1 AND 35 (INTERNATIONAL ZONING CODES) EXAM QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
19-01-2025
Written in
2024/2025

ADMINISTRATION LESION 1 AND 35 (INTERNATIONAL ZONING CODES) EXAM QUESTIONS AND ANSWERS

Institution
CODES ZONING
Course
CODES ZONING








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CODES ZONING
Course
CODES ZONING

Document information

Uploaded on
January 19, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ADMINISTRATION LESION 1 AND 35
(INTERNATIONAL ZONING CODES)
EXAM QUESTIONS AND ANSWERS
In order for an alternative material, design or method of construction to be considered
acceptable, it must be equivalent to the code based on all but which of the following
criteria? - ANSWER-economic

Test performed by -------- may be required by the building official where there is
insufficient evidence of code compliance. - ANSWER-an approved agency

A permit is not requirement for the construction of a one-story detached accessory
structure when it has a maximum floor area of ------- square feet. - ANSWER-120

Movable fixtures, cases, counters and partition are exempt from a building permit where
they have a maximum height of ------- square feet. - ANSWER-5 feet, 9 inches

Where a building is constructed in a flood hazard area, documentation of the lowest
floor elevation shall be submitted to the building official prior to --------. - ANSWER-the
final inspection

The building permit, or a copy of the permit, shall be kept -------- until completion of the
project. - ANSWER-at the job site.

When a building permit is issued, the construction documents shall be approved as
--------. - ANSWER-"Reviewed for Code Compliance"

Unless otherwise mandated by stated or local laws. the approved construction
documents shall be retained by the building official for a minimum of -------- from the
date of completion of the permitted work. - ANSWER-180 days

Which one of the following inspection is not specifically identified by the International
Building Code as a required inspection? - ANSWER-soil classification

Whose duty is it to notify the building official that the work is ready for inspection? -
ANSWER-the permit holder

The certificate of occupancy shall contain all of the following information except: -
ANSWER-the building's maximum height and area

A temporary certificate of occupancy is valid for what maximum period of time? -
ANSWER-a period set by the building official

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
247
Member since
2 year
Number of followers
68
Documents
17943
Last sold
2 days ago

4.0

38 reviews

5
22
4
4
3
6
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions