MA 2A hoisting exam
All welding and cutting on hoisting equipment must be done in accordance with
R
requirements of what - ANS American society of mechanical engineering (ASME)
requirements -
HE
All welding and cutting on hoisting equipment needs to be performed under what
ANS 1998 section 9 of A.S.M.E code
IG
At what depth is it required to have a ladder or stairs in trench - ANS 4'
GH
At what intervals should equipment be inspected - ANS Every day do circle
check, start of every shift. Every 30 days for rigging. 90 days for full inspection
IN
At which position should the moving parts of the machine be in when not in use -
Y
ANS Lowered to the ground and secured
FL
Before any excavation begins you must do what by law -
Before loading a machine onto a trailer be sure to check what -
ANS Notify dig safe
ANS Make sure
wheels are chalked
, 2
Can internal combustion engines be operated in a confined space - ANS Yes if
properly ventalated
Describe a slow moving vehicle triangle and at what speed can they not exceed -
R
ANS Red triangle with an orange center 25 mph
HE
Do all machines need backup alarms - ANS Yes
G
Do you need a fire extinguisher on a hoisting machine - ANS Yes minimum 5 lbs
HI
Do you need hoisting license on private property - ANS Yes
G
How close to a marked utility can you dig - ANS Hand dig within 18" of marked
N
utility
YI
How do you get a buried man out of a hole - ANS By hand without the use of any
L
shovels or tools
minute
F
How do you test the load brakes - ANS Pick test, lift load about 1', hold it for one
How far does the spoil have to be from the edge of the hole - ANS 2'