Con 367 Midterm 2 (Prep Quiz) Exam Questions With Correct Answers 100% Guaranteed Pass. True/ False The dollar amount shown for each line item in a Schedule of Values reflects the direct cost for that line item only and does not include the profit and overhead. - AnswerFalse Which of the following is not in the To-Do list for the Facilitator in a Meeting? -Empower the attendees to communicate their ideas only if they agree with you. -Have an agenda and distribute it to the attendees well in advance of the meeting. - Know what you want to accomplish. -Communicate action items at the conclusion of the meeting. - AnswerEmpower the attendees to communicate their ideas only if they agree with you. Which of the following is not the responsibility of the Designer? -Generate the shop drawings in a timely manner. -Review the RFIs and respond to them in a timely manner. -Consult with the Resident Project Representative in evaluating the RFIs. 2 | P a g e -Avoid directing or controlling the Contractor's means and methods. - AnswerGenerate the shop drawings in a timely manner. True/ False Preconstruction meeting is typically held after the construction operations begin. - AnswerFalse True/ False Builder's Risk Insurance is typically purchased by the Designer. - AnswerFalse Which of the following is not a characteristic of Schedule of Values (SOV)? -It should be prepared by the Contractor and submitted to the Owner at the end of the project. -Line items in the SOV are typically determined by the Owner. -The greater the detail in the SOV, the more accurate the estimate for the progress payments. -The Contractor must prorate overhead and profit on the line items in the SOV. - AnswerIt should be prepared by the Contractor and submitted to the Owner at the end of the project. In the tripartite relationship inherent in construction bonding between the Owner, Contractor, and Surety, which one is the Obligee? - AnswerOwner True/ False According to the negotiation method discussed in class (Getting to Yes), one thing that needs to be done during negotiations is not to attack each other but to attack the problem. - AnswerTrue Which of the following statements is wrong for Retainage? -Retainage is typically 25-30% of each earned fund. -In some cases, the retained amount may be reduced or eliminated at some point during the project (typically after the half of the project is completed). -Sometimes the Owner may release retainage early on work that was completed early in the project, typically for subcontractors (e.

Show more Read less
Institution
CON 367
Course
CON 367









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 367
Course
CON 367

Document information

Uploaded on
January 16, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Con 367 Midterm 2 (Prep Quiz) Exam
Questions With Correct Answers 100%
Guaranteed Pass.


True/ False
The dollar amount shown for each line item in a Schedule of Values reflects the direct cost for
that line item only and does not include the profit and overhead. - Answer✔False
Which of the following is not in the To-Do list for the Facilitator in a Meeting?


-Empower the attendees to communicate their ideas only if they agree with you.


-Have an agenda and distribute it to the attendees well in advance of the meeting.


- Know what you want to accomplish.


-Communicate action items at the conclusion of the meeting. - Answer✔Empower the attendees
to communicate their ideas only if they agree with you.
Which of the following is not the responsibility of the Designer?


-Generate the shop drawings in a timely manner.


-Review the RFIs and respond to them in a timely manner.


-Consult with the Resident Project Representative in evaluating the RFIs.




1|Page

, -Avoid directing or controlling the Contractor's means and methods. - Answer✔Generate the
shop drawings in a timely manner.
True/ False
Preconstruction meeting is typically held after the construction operations begin. -
Answer✔False
True/ False
Builder's Risk Insurance is typically purchased by the Designer. - Answer✔False
Which of the following is not a characteristic of Schedule of Values (SOV)?


-It should be prepared by the Contractor and submitted to the Owner at the end of the project.


-Line items in the SOV are typically determined by the Owner.


-The greater the detail in the SOV, the more accurate the estimate for the progress payments.


-The Contractor must prorate overhead and profit on the line items in the SOV. - Answer✔It
should be prepared by the Contractor and submitted to the Owner at the end of the project.
In the tripartite relationship inherent in construction bonding between the Owner, Contractor, and
Surety, which one is the Obligee? - Answer✔Owner
True/ False
According to the negotiation method discussed in class (Getting to Yes), one thing that needs to
be done during negotiations is not to attack each other but to attack the problem. - Answer✔True
Which of the following statements is wrong for Retainage?


-Retainage is typically 25-30% of each earned fund.


-In some cases, the retained amount may be reduced or eliminated at some point during the
project (typically after the half of the project is completed).


-Sometimes the Owner may release retainage early on work that was completed early in the
project, typically for subcontractors (e.g. site work).


2|Page

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
595
Member since
1 year
Number of followers
178
Documents
23585
Last sold
9 hours ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

119 reviews

5
56
4
21
3
21
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions