100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NJDEP BMP Manual Exam Questions and Answers 100% Pass

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
10-01-2025
Written in
2024/2025

NJDEP BMP Manual Exam Questions and Answers 100% Pass The following linear development projects are exempt from groundwater recharge , sw runoff quantity, and sw runoff quality: - 1. The construction of an underground utility line provided that the disturbed areas are revegetated upon completion 2. The construction of an aboveground utility line provided that the existing conditions are maintained to the maximum extent practicable 3. The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14 FT, provided that the access is made of permeable material A waiver from strict compliance from the green infrastructure, groundwater recharge, sw runoff quantity, and sw runoff quality requirements may be obtained for the enlargement of an existing public roadway or railroad, or enlargement of a public pedestrian access, provided that the following conditions are met: - 1. The applicant demonstrates that there is a public need for the project that cannot be accomplished by other means. 2. The applicant demonstrates through an alternatives analysis, that the use of sw management measures, the option selected complies to the maximum extent practicable 3. The applicant demonstrates that, in order to meet the requirements of 7:8 existing structures currently in use, such as homes and buildings would need to be condemned 4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands within the upstream drainage area of the receiving stream EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2 What do you need mitigation (relief) for? - A variance or waiver BMP's for SW runoff quality and groundwater recharge - -Dry Well -Pervious Paving System (when designed to infiltrate into subsoil) -Small-Scale Bioretention Basin (when designed to infiltrate into subsoil) -Small-Scale Infiltration Basin -Small-Scale Sand Filter BMP's for SW runoff quality - -Cistern -Dry Well -Grass Swale -Green Roof -Manufactured Treatment Device (MTD) -Pervious Paving System -Small-Scale Bioretention Basin -Small-Scale Infiltration Basin -Small-Scale Sand Filter -Vegetative Filter Strip BMP's for SW runoff quantity - -Bioretention System -Infiltration Basin -Sand Filter -Standard Constructed Wetland EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 3 -Wet Pond BMP's for SW runoff quantity and groundwater recharge - -Bioretention System (when designed to infiltrate into subsoil) -Infiltration System -Sand Filter BMP's only with a waiver or variance - -Blue Roof -Extended Detention Basin -Manufactured Treatment Device (MTD) -Sand Filter -Subsurface Gravel Wetland -Wet Pond Dry Well Info: - SW Runoff Quality TSS removal

Show more Read less
Institution
UST Operator A/B
Course
UST Operator A/B









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
UST Operator A/B
Course
UST Operator A/B

Document information

Uploaded on
January 10, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NJDEP BMP Manual Exam
Questions and Answers 100% Pass

The following linear development projects are exempt from groundwater recharge , sw runoff quantity,

and sw runoff quality: - ✔✔1. The construction of an underground utility line provided that the disturbed

areas are revegetated upon completion


2. The construction of an aboveground utility line provided that the existing conditions are maintained to

the maximum extent practicable


3. The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14

FT, provided that the access is made of permeable material


A waiver from strict compliance from the green infrastructure, groundwater recharge, sw runoff

quantity, and sw runoff quality requirements may be obtained for the enlargement of an existing public

roadway or railroad, or enlargement of a public pedestrian access, provided that the following conditions

are met: - ✔✔1. The applicant demonstrates that there is a public need for the project that cannot be

accomplished by other means.


2. The applicant demonstrates through an alternatives analysis, that the use of sw management measures,

the option selected complies to the maximum extent practicable


3. The applicant demonstrates that, in order to meet the requirements of 7:8 existing structures currently

in use, such as homes and buildings would need to be condemned


4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to

obtain through condemnation lands within the upstream drainage area of the receiving stream




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 1

, What do you need mitigation (relief) for? - ✔✔A variance or waiver


BMP's for SW runoff quality and groundwater recharge - ✔✔-Dry Well


-Pervious Paving System (when designed to infiltrate into subsoil)


-Small-Scale Bioretention Basin (when designed to infiltrate into subsoil)


-Small-Scale Infiltration Basin


-Small-Scale Sand Filter


BMP's for SW runoff quality - ✔✔-Cistern


-Dry Well


-Grass Swale


-Green Roof


-Manufactured Treatment Device (MTD)


-Pervious Paving System


-Small-Scale Bioretention Basin


-Small-Scale Infiltration Basin


-Small-Scale Sand Filter


-Vegetative Filter Strip


BMP's for SW runoff quantity - ✔✔-Bioretention System


-Infiltration Basin


-Sand Filter


-Standard Constructed Wetland




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
448
Member since
2 year
Number of followers
138
Documents
21009
Last sold
3 days ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.7

98 reviews

5
46
4
13
3
15
2
7
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions