90/10 Rule - CORRECT ANSWER: "Decisions made during the first 10 percent of a
project's effort determine 90 percent of a project's
outcome, particularly as it relates to cost and schedule."
[Special Topics, Value Management]
Adaptive Re-Use - CORRECT ANSWER: "A change of use where an existing building
that has
served a particular use is altered to accommodate a
new use. For instance, a classroom building may be
renovated for use as a residence hall."
[Special Topics, Renovations]
Agency Construction Management - CORRECT ANSWER: "A professional service that
can be applied to all delivery
systems where the CM acts as the owner's principal agent in
the management of a construction project or program, or
where the CM is responsible to the owner for managing the
planning, design, construction, and post construction phases,
or portions thereof."
[Facilities Design and Construction, Construction Management]
Alteration - CORRECT ANSWER: "Construction or renovation to an existing structure
rather than repair or addition."
[Special Topics, Renovations]
,Architect/Engineer (A/E) - CORRECT ANSWER: "The design consultant responsible for
preparing plans
and specifications and interpreting these documents
during construction."
[Facilities Design and Construction, Construction Management]
Assignable Square Feet (ASF) - CORRECT ANSWER: "Refers to the amount of space
that may be used for
programs within interior walls of a room. It is commonly
referred to as the usable or needed space for programs
to operate."
[Facilities Planning, Space Planning and Administration]
Bar Chart - CORRECT ANSWER: "The most common type of schedule used for
campus
projects. Construction activities are plotted on the
vertical axis and the allotted project time is plotted on
the horizontal axis."
[Facilities Design and Construction, Construction Management]
Basis of Design (BOD) - CORRECT ANSWER: "A document that records the concepts,
calculations,
decisions, and product selections used to meet the
Owner's Project Requirements and to satisfy applicable
regulatory requirements, standards, and guidelines."
[Facilities Design and Construction, The Building Commissioning
Process]
Bid Bond - CORRECT ANSWER: "Ensures that a bid is a serious, bona fide bid and
, provides compensation to an owner in the event that
the low bidder fails to honor his or her bid."
[Facilities Design and Construction, Construction Management]
Binding Arbitration - CORRECT ANSWER: "Involves the submission of a dispute to a
neutral party
who hears the case and makes a decision."
[Facilities Design and
Construction, Construction Management]
Builder's Risk Insurance - CORRECT ANSWER: "Industry standard property insurance
covering the
project itself from perils such as fire, smoke, collapse,
vandalism, water, and freezing."
[Facilities Design and Construction, Construction Management]
Building Commissioning - CORRECT ANSWER: "A quality-focused process for
enhancing the delivery of a
project. The process focuses on verifying and documenting
that the facility and all of its systems and assemblies are
planned, designed, installed, tested, operated, and
maintained to meet the owner's project requirements."
[Facilities Design and Construction, The Building Commissioning Process]
Building Information Modeling (BIM) - CORRECT ANSWER: "Enables project
participants to access various digital
models throughout the design process without having
to wait for paper drawings to be produced and
delivered."
[Special Topics, Building Information Modeling]