CON 367 - Exam 1 With Correct
Answers
Under the Contractor Quality Control (CQC) process, inspection is provided
by the contractor (T/F) - ANSWER True
Owners generally engage the services of a professional construction
management firm (Agency CM) in fast-track projects with multiple contracts.
(T/F) - ANSWER True
A professional construction management firm (Agency CM) can participate in
the following phases of a project
Close out only
Construction only
conception and Design only
Conception, program planning, Design, Construction and Closeout -
ANSWER Conception, program planning, Design, Construction and Closeout
The Design-Build (DB) project delivery process may face some barriers when
tried to be implemented in the public sector. (T/F) - ANSWER true
, In a project with multiple prime contractors, who is responsible for
coordinating the various trade contractors?
Subcontractors
Owner or its representative (e.g. the construction manager)
Contractor need to coordinate the work among themselves
Material Suppliers - ANSWER Owner or its representative (e.g. the
construction manager)
Which of the following is under the authority of the Resident Project
Representative?
To require the contractor to furnish more than that required by the plans
and specifications
To approve materials & worksmanship that meet the contract requirements
To approve deviations from the contract requirements - ANSWER To
approve materials & worksmanship that meet the contract requirements
The Resident Project Representative should obtain the contract documents
and study those as soon as being engaged to provide resident inspection on
a project. (T/F) - ANSWER True
Answers
Under the Contractor Quality Control (CQC) process, inspection is provided
by the contractor (T/F) - ANSWER True
Owners generally engage the services of a professional construction
management firm (Agency CM) in fast-track projects with multiple contracts.
(T/F) - ANSWER True
A professional construction management firm (Agency CM) can participate in
the following phases of a project
Close out only
Construction only
conception and Design only
Conception, program planning, Design, Construction and Closeout -
ANSWER Conception, program planning, Design, Construction and Closeout
The Design-Build (DB) project delivery process may face some barriers when
tried to be implemented in the public sector. (T/F) - ANSWER true
, In a project with multiple prime contractors, who is responsible for
coordinating the various trade contractors?
Subcontractors
Owner or its representative (e.g. the construction manager)
Contractor need to coordinate the work among themselves
Material Suppliers - ANSWER Owner or its representative (e.g. the
construction manager)
Which of the following is under the authority of the Resident Project
Representative?
To require the contractor to furnish more than that required by the plans
and specifications
To approve materials & worksmanship that meet the contract requirements
To approve deviations from the contract requirements - ANSWER To
approve materials & worksmanship that meet the contract requirements
The Resident Project Representative should obtain the contract documents
and study those as soon as being engaged to provide resident inspection on
a project. (T/F) - ANSWER True