100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NEBOSH NCC1 QUESTIONS WITH VERIFIED ANSWERS [ GRADED A+]

Rating
-
Sold
-
Pages
52
Grade
A+
Uploaded on
06-01-2025
Written in
2024/2025

NEBOSH NCC1 QUESTIONS WITH VERIFIED ANSWERS [ GRADED A+] Construction issues - Transitory nature of workers Temporary nature of construction activities and the constantly changing workplace Time pressures from clients and principal contractors Weather conditions Levels of numeracy and literacy of workers Non-English speaking workers High risk areas for injuries in construction - Falls from height Slips, trips and falls ©morren2024/2025.Year published 2024. Being struck by falling/moving objects Manual handling Construction (Design and Management) Regulations 2007 - Apply to all construction projects Duties placed on clients, designers and all construction workers CDM regs - notifiable projects - Construction phase will last longer than 30 days Construction phase will involve more than 500 person days at work Duty holders for notifiable projects - Client - have most influence Designers - have responsibility beyond construction phase Contractors - competence CDM Co-ordinator - advise client of their duties, co- ordinates others ©morren2024/2025.Year published 2024.

Show more Read less
Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
January 6, 2025
Number of pages
52
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NEBOSH NCC1 QUESTIONS WITH VERIFIED

ANSWERS [ GRADED A+]




Construction issues - ✔✔Transitory nature of workers


Temporary nature of construction activities and the constantly changing

workplace


Time pressures from clients and principal contractors


Weather conditions


Levels of numeracy and literacy of workers

Non-English speaking workers




High risk areas for injuries in construction - ✔✔Falls from height


Slips, trips and falls



©morren2024/2025.Year published 2024.

,Being struck by falling/moving objects


Manual handling




Construction (Design and Management) Regulations 2007 - ✔✔Apply to all

construction projects


Duties placed on clients, designers and all construction workers




CDM regs - notifiable projects - ✔✔Construction phase will last longer than 30

days


Construction phase will involve more than 500 person days at work




Duty holders for notifiable projects - ✔✔Client - have most influence


Designers - have responsibility beyond construction phase


Contractors - competence


CDM Co-ordinator - advise client of their duties, co- ordinates others




©morren2024/2025.Year published 2024.

,Principal contractor - safe working, co- ordination and co-operation between

contractors




CDM client duties - ✔✔Appoint competent persons


Ensure suitable mgmt of welfare


Allow sufficient time and resources


Provide pre-construction info

Appoint duty holders for notifiable projects


Retain and provide access to health and safety file




CDM co-ordinator CDM duties - ✔✔Advise and assist client with their duties


Notify HSE


Co-ordinate H&S aspects of design work and co-operate with others


Facilitate good communication


Liaise with principal contractor re ongoing design




©morren2024/2025.Year published 2024.

, Pass on pre-construction information


Prepare/update H&S file




Designer CDM duties - ✔✔Check client is aware of their duties


Eliminate hazards and reduce risks during design


Provide information about remaining risks


Check CDM co-ordinator has been appointed


Provide any information needed for H&S file




Principal contractors CDM duties - ✔✔Plan, manage and monitor construction

phase


Prepare, develop and implement a written plan and site rules


Give contractors relevant parts of the plan


Provide suitable welfare facilities


Check competence of all appointees




©morren2024/2025.Year published 2024.
$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
morren

Get to know the seller

Seller avatar
morren Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
3 year
Number of followers
2
Documents
1269
Last sold
1 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions