How are lights and luminaires controlled? - Correct Ans-By a PhotoCell Control and for circuits operating at less than 10 amps, a Photocell switch is used What are the three types of inspection? - Correct Ans-Initial, Interim and routine How many times per foot should loop wires be twisted? - Correct Ans-5 twists per foot How wide should loops be cut and at what depth? - Correct Ans-5/16th Wide and 1 3/4" deep what should be installed on loops wires they cross a crack or joint? - Correct Ans-A plastic sleeve that extends 4" past the joint/crack. How should spare signal conductors be arraigned inside the box? - Correct Ans-Spare conductors should be connected to a terminals. unused What should happen prior and during the installation of loops wires? - Correct Ans-1. Clean saw cuts and remove debris by means of sandblasting, water blasting or wire brushing 2. Do not allow vehicles to drive over open cuts 3. Utilized plastic sleeves between joints How is loop wire required to be placed? - Correct Ans-continuously What is placed ontop of continuous loop wires? - Correct Ans-2' long Backer Rod What is the required wire slack amount left inside of pull box? - Correct Ans-Minimum of 36" How long until subjected live load can be applied to anchor bolts? - Correct Ans-Until concrete meets it required 28 day strength What type of pattern is recommended when tightening bolts? - Correct Ans-The Star Pattern Prior to erection of traffic lights, What are the elements an inspector is looking for? - Correct Ans-1.Bent or damaged parts 2. damaged coatings 3. Distortions 4. defective fabrication What elements of a traffic light assembly should be inspected prior to erection? - Correct Ans-1.Posts 2. End Frames 3. Mast arms 4. Trusses How can light poles be erected? - Correct Ans-Light poles and light supports can be assembled from the ground if they contain a short cantilevered arms. What are the inspection types for welds? - Correct Ans-Magnetic Particle testing (MT) and dye-penetrant (PT) testing or ultrasonic testing What should be provided if conduit crosses a structural joint? - Correct Ans-Metal expansion and deflection fittings What is the dimensions of the copper clad steel rods? - Correct Ans-Rods should be 5/8th thick and 8' long. What are the size of micropiles? - Correct Ans-Typically less than 12" What is the size of driven piles? - Correct Ans-Between 12 and 36" What is the required surface temperature for painting a bridge? - Correct Ans-Surface temps must be between 50 and 100 degrees When painting a bridge, what must be the humidity percentage be? - Correct Ans-85% or less unless manufactures recommendations say otherwise When cleaning unsound paint, how far into the intact coat should you be? - Correct Ans-Extend the prepared area at least 2 inches into adjacent tightly adhering, intact coating. When should primer be applied when painting a bridge? - Correct Ans-. Only where paint is removed to bare metal. Otherwise, apply only intermediate and finish paints What do the color bonnets on fire hydrants mean? - Correct Ans-Light Blue - 1,500GPM or above Green: GPM Orange: 500 - 999GPM Red: Less than 500 GPM What should be done to inoperable fire hydrants? - Correct Ans-Fire hydrants should be wrapped or parts on the hydrant color black What should be done if a hydrant is 20GPM or below? - Correct Ans-GPM should be stenciled on the fire hydrant caps and top.

Show more Read less
Institution
NICET ,
Course
NICET ,









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET ,
Course
NICET ,

Document information

Uploaded on
January 6, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • nicet

Content preview

NICET LEVEL 3 HIGHWAY CONSTRUCTION
NEWEST 2025 ACTUAL EXAM
How are lights and luminaires controlled? - Correct Ans-By a PhotoCell Control and for
circuits operating at less than 10 amps, a Photocell switch is used

What are the three types of inspection? - Correct Ans-Initial, Interim and routine

How many times per foot should loop wires be twisted? - Correct Ans-5 twists per foot

How wide should loops be cut and at what depth? - Correct Ans-5/16th Wide and 1 3/4"
deep

what should be installed on loops wires they cross a crack or joint? - Correct Ans-A
plastic sleeve that extends 4" past the joint/crack.

How should spare signal conductors be arraigned inside the box? - Correct Ans-Spare
conductors should be connected to a terminals. unused

What should happen prior and during the installation of loops wires? - Correct Ans-1.
Clean saw cuts and remove debris by means of sandblasting, water blasting or wire
brushing
2. Do not allow vehicles to drive over open cuts
3. Utilized plastic sleeves between joints

How is loop wire required to be placed? - Correct Ans-continuously

What is placed ontop of continuous loop wires? - Correct Ans-2' long Backer Rod

What is the required wire slack amount left inside of pull box? - Correct Ans-Minimum of
36"

How long until subjected live load can be applied to anchor bolts? - Correct Ans-Until
concrete meets it required 28 day strength

What type of pattern is recommended when tightening bolts? - Correct Ans-The Star
Pattern

Prior to erection of traffic lights, What are the elements an inspector is looking for? -
Correct Ans-1.Bent or damaged parts
2. damaged coatings
3. Distortions
4. defective fabrication




NICET LEVEL 3

, What elements of a traffic light assembly should be inspected prior to erection? -
Correct Ans-1.Posts
2. End Frames
3. Mast arms
4. Trusses

How can light poles be erected? - Correct Ans-Light poles and light supports can be
assembled from the ground if they contain a short cantilevered arms.

What are the inspection types for welds? - Correct Ans-Magnetic Particle testing (MT)
and dye-penetrant (PT) testing or ultrasonic testing

What should be provided if conduit crosses a structural joint? - Correct Ans-Metal
expansion and deflection fittings

What is the dimensions of the copper clad steel rods? - Correct Ans-Rods should be
5/8th thick and 8' long.

What are the size of micropiles? - Correct Ans-Typically less than 12"

What is the size of driven piles? - Correct Ans-Between 12 and 36"

What is the required surface temperature for painting a bridge? - Correct Ans-Surface
temps must be between 50 and 100 degrees

When painting a bridge, what must be the humidity percentage be? - Correct Ans-85%
or less unless manufactures recommendations say otherwise

When cleaning unsound paint, how far into the intact coat should you be? - Correct Ans-
Extend the prepared area at least 2 inches into adjacent tightly adhering, intact coating.

When should primer be applied when painting a bridge? - Correct Ans-. Only where
paint is removed to bare metal. Otherwise, apply only intermediate and finish paints

What do the color bonnets on fire hydrants mean? - Correct Ans-Light Blue - 1,500GPM
or above
Green: 1000-1499GPM
Orange: 500 - 999GPM
Red: Less than 500 GPM

What should be done to inoperable fire hydrants? - Correct Ans-Fire hydrants should be
wrapped or parts on the hydrant color black

What should be done if a hydrant is 20GPM or below? - Correct Ans-GPM should be
stenciled on the fire hydrant caps and top.




NICET LEVEL 3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bestzone Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
181
Member since
4 year
Number of followers
111
Documents
5004
Last sold
1 month ago
STUDY EXAMS AND STUDY GUIDES SUMMARIES ESSAY ALL VERIFIED

WELCOME!!!

3.9

27 reviews

5
13
4
4
3
6
2
2
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions