100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU Project Management C722: Comprehensive Guide to Unit 7, Modules 23 & 24

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
05-01-2025
Written in
2024/2025

WGU Project Management C722: Comprehensive Guide to Unit 7, Modules 23 & 24

Institution
WGU C722
Course
WGU C722









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C722
Course
WGU C722

Document information

Uploaded on
January 5, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

WGU Project Management C722: Comprehensive Guide to Unit 7,
Modules 23 & 24

Project management often uses the term ________ to describe the number of time periods required to
complete some portion of the work.

a. resource estimation

b. duration

c. project schedule - correct answer ✔✔b. duration



Duration is used to describe the number of time periods required to complete a portion of the work.



Because the activity durations will be integrated with the activity sequencing to become the approved
schedule, who should have primary input into the duration estimates?



a. The project manager



b. Stakeholders



c. The project sponsor



d. The team member doing the work - correct answer ✔✔d. the team member doing the work



The team member doing the work will have a better idea of how long an activity should take.



The problem with using the _______ estimation method is that the people providing the estimate can be
too optimistic or too pessimistic, which results in unreliable duration estimates.

a. probabilistic

b. deterministic

c. triangular - correct answer ✔✔b. deterministic

, Deterministic estimation relies on one-point estimating, so it is dependent on the expertise of the person
providing the estimate rather than on multiple inputs.



You are your own project manager for a renovation project on your kitchen. Your contractors have given
you the following duration estimates for the work that needs to be done:

Optimistic Estimate = 12 days

Most Likely Estimate = 22 days

Pessimistic Estimate = 40 days

What is the simple average (rounded to the nearest day)?



a. 25 days



b. 23 days



c. 22 days



d. 28 days - correct answer ✔✔a. 25 days



Using the formula (O + M + P)/3, the simple average is 24.7 days, rounded up to 25.



What is the weighted average or beta distribution method estimate of duration (rounded to the nearest
day)?

Optimistic Estimate = 12 days

Most Likely Estimate = 22 days

Pessimistic Estimate = 40 days

What is the simple average (rounded to the nearest day)?



a.22 days



b. 25 days

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BravelRadon Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
868
Member since
4 year
Number of followers
540
Documents
41079
Last sold
5 hours ago
EXAM HUB

Welcome to Exam Hub Are you looking for high-quality, exam-ready notes, past papers, Test Banks, and well-researched study materials to boost your grades? You’re in the right place! I create and upload detailed, easy-to-understand, and well-structured documents across multiple subjects. All my materials are designed to help you study , save time, and excel in your coursework and exams! On this page NURSING EXAMS,STUDY GUIDES,TESTBANKS AND QUALITY EXAMS IS THE KEY TO STUDENTS CAREER EXCELLENCE, you find all documents, package deals, and flashcards offered by BravelRadon (EXAM HUB STORES!)....kindly recommend a friend for A+ GARANTEEd either you are a first-year student or final-year graduation! best of luck!

Read more Read less
3.5

153 reviews

5
55
4
30
3
32
2
8
1
28

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions