Questions and CORRECT Answers
What is one function of capacity allocation in SAFe? - CORRECT ANSWER - To
facilitate working agreements on the capacity to apply between different types of work
To evolve the role of a leader in SAFe, which practices can the Release Train Engineer (RTE)
recommend? - CORRECT ANSWER - Encourage personal development
At which stage will the ART act as a one-team culture? - CORRECT ANSWER - Creating
a flow of knowledge across the teams and ART, known as performing
Which primary role should emphasize lifelong learning? - CORRECT ANSWER - Lean-
Agile Leaders
What is one tool used to identify bottlenecks? - CORRECT ANSWER - Value Stream
Mapping
Which role should the Release Train Engineer (RTE) play related to a hackathon event? -
CORRECT ANSWER - Allow the teams as much flexibility as possible to promote
innovation
What is one method for securing stakeholder commitment to the ART? - CORRECT
ANSWER - Have them attend the PI Planning
What is one characteristic of the Release Train Engineer (RTE) role? - CORRECT
ANSWER - Creates an environment of mutual influence
What is one action done immediately during the management review and problem-solving
meeting? - CORRECT ANSWER - Change the scope
, What is an outcome of the team's draft plan review at the end of the first day of PI Planning? -
CORRECT ANSWER - Risks and impediments
What is one responsibility of the Release Train Engineer (RTE) during PI execution? -
CORRECT ANSWER - To escalate and track impediments
What is one recommended practice that helps with the preparation and facilitation of distributed
planning events? - CORRECT ANSWER - Request a technical support person be present
at each location
Which statement is true about using a ART Kanban system? - CORRECT ANSWER - All
work is visualized, and progress is continually tracked (??)
During which part of an Inspect & Adapt (I&A) event are differences between planned business
value and actual business value presented? - CORRECT ANSWER - Quantitative and
qualitative measurement
When is the best time to conduct the pre-PI Planning activities? - CORRECT ANSWER -
Throughout the previous PI
Which SAFe principle supports having a one-week iteration? - CORRECT ANSWER -
Apply cadence, synchronize with cross-domain planning
What practice can help identify bottlenecks in the flow of work? - CORRECT ANSWER -
Visualizing the flow of all work and track the progress of individual items
Which core competency best describes the critical skills of Scrum, Kanban, and the built-in
quality practices needed to manage the flow of value? - CORRECT ANSWER - Team and
Technical Agility
A Release Train Engineer (RTE) wants to try a new retrospective technique at the next Inspect
and Adapt (I&A) event. However, the RTE is unsure how to prepare and thinks there may be