NACE test 3 questions and answers with solutions 2025
You are on a job and observe the coating is being applied in an unacceptable manner. As the inspector you should: - ANSWER Report to the contractor's supervisor Report to the owner's representative Which standard gives guidelines for how many DFT measurements should be taken in a given area? - ANSWER SSPC-PA 2 A prejob conference should be held: - ANSWER After bids have been submitted and contracts signed Which of the following are goals of a prejob conference? - ANSWER Review and discuss the scope of work Discuss lines of communication between parties Discuss and clarify inspector's responsibilities and authority What is one of the inspector's roles at a prejob conference? - ANSWER Clarify reporting requirements According to ASTM D 4417 Method B - 2014, when taking measurements using a profile gauge, at each location you should make? - ANSWER Ten (10) readings per location, recording the maximum value. Determine mean (average) for all maximum values as the reported profile Daily reports or weekly reports should be written in? - ANSWER Pen Inspection records may be used to? - ANSWER Help in resolving legal or arbitration disputes Assist owners in the evaluation of the applicator performance Assist owners in the evaluation of the inspector's performance
Written for
- Institution
- NACE
- Course
- NACE
Document information
- Uploaded on
- December 23, 2024
- Number of pages
- 3
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nace test 3 questions and answers with solutions 2
Also available in package deal