RISK MANAGEMENT POST TEST LCPL
QUESTIONS WITH COMPLETE
ANSWERS
The __________ level of Risk Management applies when on-the-run decisions are
needed at the beginning of or during the execution of a task or mission. -Answer-
time critical
Using the Marine Corps Planning Process (MCPP) to produce an operations order
(OPORD) is an example of which level of Risk Management? -Answer-Deliberate
Which of the following is one of the reasons to debrief after doing an event when
using the ABCD Model? -Answer-To capture and disseminate lessons learned
Prioritize types of controls from most preferred to least preferred. -Answer-
Engineering, administrative, physical
First Sergeant Jones posts a sign outside the entrance to the maintenance shop
indicating that hearing protection is required inside. This is an example of what type
of risk control? -Answer-Administrative
What causes the majority of all mishaps? -Answer-Human error
True or false, creating a risk assessment worksheet is associated with Time Critical
Risk Management (TCRM). -Answer-False
Select the statement that is an example of a situation when you would apply Time
Critical Risk Management (TCRM). -Answer-Changing the route during the execution
of a convoy
Designing a quiet generator to reduce the amount of hazardous noise is an example
of what type of risk control? -Answer-Engineering
According to the Make Risk Decision step of the 5-step Risk Management process,
after you identify and assess control options, you next determine the ___________. -
Answer-Type of control
After a mishap, which level will investigators normally first address during root cause
analysis? -Answer-Operator level
Which Risk Management principle is best demonstrated by thorough hazard
identification and assessment in order to prevent needlessly jeopardizing Marines
and equipment? -Answer-Accept no unnecessary risk
Choose an example of an engineering control. -Answer-Designing and installing a
ventilation system to reduce exposure to toxic fumes in a building
QUESTIONS WITH COMPLETE
ANSWERS
The __________ level of Risk Management applies when on-the-run decisions are
needed at the beginning of or during the execution of a task or mission. -Answer-
time critical
Using the Marine Corps Planning Process (MCPP) to produce an operations order
(OPORD) is an example of which level of Risk Management? -Answer-Deliberate
Which of the following is one of the reasons to debrief after doing an event when
using the ABCD Model? -Answer-To capture and disseminate lessons learned
Prioritize types of controls from most preferred to least preferred. -Answer-
Engineering, administrative, physical
First Sergeant Jones posts a sign outside the entrance to the maintenance shop
indicating that hearing protection is required inside. This is an example of what type
of risk control? -Answer-Administrative
What causes the majority of all mishaps? -Answer-Human error
True or false, creating a risk assessment worksheet is associated with Time Critical
Risk Management (TCRM). -Answer-False
Select the statement that is an example of a situation when you would apply Time
Critical Risk Management (TCRM). -Answer-Changing the route during the execution
of a convoy
Designing a quiet generator to reduce the amount of hazardous noise is an example
of what type of risk control? -Answer-Engineering
According to the Make Risk Decision step of the 5-step Risk Management process,
after you identify and assess control options, you next determine the ___________. -
Answer-Type of control
After a mishap, which level will investigators normally first address during root cause
analysis? -Answer-Operator level
Which Risk Management principle is best demonstrated by thorough hazard
identification and assessment in order to prevent needlessly jeopardizing Marines
and equipment? -Answer-Accept no unnecessary risk
Choose an example of an engineering control. -Answer-Designing and installing a
ventilation system to reduce exposure to toxic fumes in a building