100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

RISK MANAGEMENT POST TEST LCPL QUESTIONS WITH COMPLETE ANSWERS

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
23-12-2024
Written in
2024/2025

RISK MANAGEMENT POST TEST LCPL QUESTIONS WITH COMPLETE ANSWERS

Institution
RIMS-CRMP
Course
RIMS-CRMP








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
RIMS-CRMP
Course
RIMS-CRMP

Document information

Uploaded on
December 23, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RISK MANAGEMENT POST TEST LCPL
QUESTIONS WITH COMPLETE
ANSWERS
The __________ level of Risk Management applies when on-the-run decisions are
needed at the beginning of or during the execution of a task or mission. -Answer-
time critical

Using the Marine Corps Planning Process (MCPP) to produce an operations order
(OPORD) is an example of which level of Risk Management? -Answer-Deliberate

Which of the following is one of the reasons to debrief after doing an event when
using the ABCD Model? -Answer-To capture and disseminate lessons learned

Prioritize types of controls from most preferred to least preferred. -Answer-
Engineering, administrative, physical

First Sergeant Jones posts a sign outside the entrance to the maintenance shop
indicating that hearing protection is required inside. This is an example of what type
of risk control? -Answer-Administrative

What causes the majority of all mishaps? -Answer-Human error

True or false, creating a risk assessment worksheet is associated with Time Critical
Risk Management (TCRM). -Answer-False

Select the statement that is an example of a situation when you would apply Time
Critical Risk Management (TCRM). -Answer-Changing the route during the execution
of a convoy

Designing a quiet generator to reduce the amount of hazardous noise is an example
of what type of risk control? -Answer-Engineering

According to the Make Risk Decision step of the 5-step Risk Management process,
after you identify and assess control options, you next determine the ___________. -
Answer-Type of control

After a mishap, which level will investigators normally first address during root cause
analysis? -Answer-Operator level

Which Risk Management principle is best demonstrated by thorough hazard
identification and assessment in order to prevent needlessly jeopardizing Marines
and equipment? -Answer-Accept no unnecessary risk

Choose an example of an engineering control. -Answer-Designing and installing a
ventilation system to reduce exposure to toxic fumes in a building
$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
STUDYYGUIDE
3.0
(3)

Get to know the seller

Seller avatar
STUDYYGUIDE Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
1 year
Number of followers
0
Documents
136
Last sold
2 months ago

3.0

3 reviews

5
1
4
0
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions