SAFETY MODULE 1-4 QUESTIONS &
ANSWERS WITH GUARANTEED PASS!!
1 of
101
Term
The calculated bonding distance for this object is 2 feet 6 inches.
does the window require bonding ?
Give this one a try later!
Yes, because the average must be
you decide to talk to someone else between 25,000 and 1,000,000 ohms
with no result under 10,000 ohms or
over 5,000,000 ohms.
, No, because A + B is Yes, the down conductors are
greater than the bonding supposed to be protected
distance
Don't know?
2 of 101
Term
Scenario 2 continue
Give this one a try later!
get tools add a conductor
report it test it
Don't know?
3 of 101
Term
Which division describes a hazardous classified location with a
greater probability of ignition or explosion?
Give this one a try later!
, 1 ohm Division I
+ Ground loop
1 ohm or less
+ Ground rods
Don't know?
4 of 101
Term
scenario 1 LPS was installed in 1978
Give this one a try later!
you choose to ignore you contact the original installer for
the installation date advice
you decide to talk you report the installation to the
to someone else authorities
Don't know?
, 5 of 101
Term
a continuity test requires a meter that reads to
Give this one a try later!
6 inspection cycles 1 ohm +/- 10%
1 ohm +/- 11% 2 years
Don't know?
6 of 101
Term
Drag and drop the name and description to the correct conductor.
Give this one a try later!
+underwriters laboratories (UL)
ten, five electrode-to-electrode
+department of the Army (DA) and five electrode-to-ground
+Brazing top is number 1 then read left
to right 2 and 3
+Bolting 1 cross-run
+High-compression crimping 2 roof conductor