QUESTIONS WITH 100% VERIFIED
SOLUTIONS!!
1 of 50
Term
True or False: Extron certifications are earned through successful
completion of a series of online and/or instructor-led training
courses and exams.
Give this one a try later!
True Toolbelt
, Save and Build is used to
prepare the interface for use States
with Global Configurator
Plus.
Don't know?
2 of 50
Term
The ______ stores font and graphics files that can be used
within a project.
Give this one a try later!
File Repository Graphic Vault
Resource Library Font Archive
Don't know?
3 of 50
Term
When designing a new interface, it is good practice to the
project to ensure all of its resources are associated with its
filename.
Give this one a try later!
, Save. It is good practice
Delete. it is important to
to save the project to
delete unnecessary files to
ensure all of its resources
avoid clutter.
can be associated with its
filename.
Share. sharing the project Export. it is advisable to
helps in collaboration with export the project for backup
others. purposes.
Don't know?
4 of 50
Term
True or False: Schedules can trigger particular actions, or
multiple actions within a macro at specified times.
Give this one a try later!
Save and Build is used to
prepare the interface for use True
with Global Configurator
Plus.
True. GUI Designer assigns
Double-click unique IFs to these objects.
Don't know?
5 of 50
, Term
GC Plus projects use the ______ file extension.
Give this one a try later!
.gconfig .gcplus
email templates are used to
.gproj create custom e-mail
notifications.
Don't know?
6 of 50
Term
True or False: The Save and Build function is used to prepare
the interface for use with Global Configurator Plus.
Give this one a try later!
Save and Build is used to
prepare the interface for Export and share is
use with Global necessary for collaboration.
Configurator Plus.
Compile and run is Save and close is used to
essential for testing the finalize the project.
interface.
Don't know?