WGU C790 NURSING INFORMATICS OA EXAM AND PRE
ASSESSMENT EXAM 2024 ACTUAL EXAM 2 VERSIONS (VERSION A
AND B) COMPLETE 500 QUESTIONS WITH 100% DETAILED
VERIFIED ANSWERS/ ALREADY GRADED A+
project - ANSWER ✔✔-is a planned undertaking, with a beginning and end that produces a well-defined
result or product.
information system development project - ANSWER ✔✔-a planned undertaking that produces a new
information system
predictive approach to the SDLC - ANSWER ✔✔-assumes that the development project can be planned
and organized and that the new information system can be developed according to the plan
useful for building systems that are well understood and defined.
company may want to convert its old networked client/server system to a newer Web-based system that
includes a smartphone app. In this type of project, the staff already understands the requirements very
well, and no new processes need to be added
traditional (70s-90s)
adaptive approach to the SDLC - ANSWER ✔✔-is used when the system's requirements and/or the
users' needs aren't well understood. In this situation, the project can't be planned completely.
Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.
, 2|Page
Some system requirements may need to be determined after preliminary development work.
(late 90s-today)
project initiation (predictive) - ANSWER ✔✔-In predictive approaches, there is a group of activities that
identifies the problem and secures approval to develop a new system
Project planning (predictive) - ANSWER ✔✔-In predictive approaches, there is a group of activities that
identifies the problem and secures approval to develop a new system
map out the project's overall structure
analysis (predictive) - ANSWER ✔✔-focuses on discovering and understanding the details of the problem
or need. The intent here is to figure out exactly what the system must do to support the business
processes
design (predictive) - ANSWER ✔✔-focuses on configuring and structuring the new system components.
These activities use the requirements that were defined earlier to develop the program structure and the
algorithms for the new system
implementation (predictive) - ANSWER ✔✔-includes programming and testing the system.
deployment (predictive) - ANSWER ✔✔-involves installing and putting the system into operation.
phases of the system development project (predictive) - ANSWER ✔✔-project initiation, project planning,
analysis, design, implementation, and deployment
support phase (predictive) - ANSWER ✔✔-includes the activities needed to upgrade and maintain the
system after it has been deployed. The support phase is part of the overall SDLC, but it isn't normally
considered part of the initial development project
Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.