VA DEQ SWM Inspector Exam Questions and Answers Graded A+ What is the purpose of the Virginia Stormwater Management Program (VSMP)? To regulate and manage stormwater runoff from new and redevelopment projects to protect water quality. What is the minimum requirement for erosion and sediment control on construction sites under Virginia law? The site must have an approved Erosion and Sediment Control Plan (ESCP) prior to any land disturbance activities. What must an inspector verify during a stormwater management inspection? That the site is in compliance with the approved stormwater management plan, and that BMPs are functioning properly. What is the purpose of a Stormwater Pollution Prevention Plan (SWPPP)? To identify sources of pollution at a construction site and outline measures to prevent the contamination of stormwater runoff. 2 What is considered a Best Management Practice (BMP) for controlling stormwater runoff on a construction site? Installing silt fences and sediment basins to prevent sediment from being carried into nearby water bodies. When is a project required to apply for a General Permit for Stormwater Discharges in Virginia? When land-disturbing activities will disturb one acre or more of land. What is the function of a sediment basin on a construction site? To temporarily store stormwater runoff and allow sediment to settle before the water is discharged. What is the most effective way to reduce the amount of sediment leaving a construction site? By using sediment control practices such as silt fences, hay bales, and sediment basins. What is the primary role of the Virginia Department of Environmental Quality (DEQ) regarding stormwater management? To oversee and enforce compliance with stormwater regulations and provide guidance on best management practices. 3 What is required for the final stabilization of a construction site before the permit is closed? The site must have permanent vegetation, or an equivalent stabilization measure, to prevent erosion. What is an example of a structural BMP for stormwater management? A retention pond that captures and stores stormwater runoff to prevent flooding and water quality degradation. What is the significance of the Virginia Erosion and Sediment Control Law? It ensures that land-disturbing activities are properly controlled to minimize soil erosion and protect water quality. What is the minimum requirement for maintaining a stormwater management system on a construction site? The system must be inspected regularly, and any necessary maintenance must be performed to ensure its effectiveness. When should a Notice of Termination (NOT) be submitted for a construction project? 4 When all construction activities are complete, final stabilization is achieved, and all BMPs have been maintained. How often should stormwater management facilities be inspected during construction? At least once every 14 days and within 24 hours after a storm event of 0.5 inches or more. What is the purpose of the DEQ's Stormwater Management (SWM) Inspector Exam? To ensure that individuals have the knowledge and skills to effectively inspect and enforce stormwater management practices. What is one of the most important factors

Show more Read less
Institution
VA DEQ SWM Inspector
Course
VA DEQ SWM Inspector










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA DEQ SWM Inspector
Course
VA DEQ SWM Inspector

Document information

Uploaded on
December 9, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ SWM Inspector Exam Questions
and Answers Graded A+
What is the purpose of the Virginia Stormwater Management Program (VSMP)?


✔✔To regulate and manage stormwater runoff from new and redevelopment projects to protect

water quality.




What is the minimum requirement for erosion and sediment control on construction sites under

Virginia law?


✔✔The site must have an approved Erosion and Sediment Control Plan (ESCP) prior to any land

disturbance activities.




What must an inspector verify during a stormwater management inspection?


✔✔That the site is in compliance with the approved stormwater management plan, and that

BMPs are functioning properly.




What is the purpose of a Stormwater Pollution Prevention Plan (SWPPP)?


✔✔To identify sources of pollution at a construction site and outline measures to prevent the

contamination of stormwater runoff.




1

,What is considered a Best Management Practice (BMP) for controlling stormwater runoff on a

construction site?


✔✔Installing silt fences and sediment basins to prevent sediment from being carried into nearby

water bodies.




When is a project required to apply for a General Permit for Stormwater Discharges in Virginia?


✔✔When land-disturbing activities will disturb one acre or more of land.




What is the function of a sediment basin on a construction site?


✔✔To temporarily store stormwater runoff and allow sediment to settle before the water is

discharged.




What is the most effective way to reduce the amount of sediment leaving a construction site?


✔✔By using sediment control practices such as silt fences, hay bales, and sediment basins.




What is the primary role of the Virginia Department of Environmental Quality (DEQ) regarding

stormwater management?


✔✔To oversee and enforce compliance with stormwater regulations and provide guidance on

best management practices.

2

, What is required for the final stabilization of a construction site before the permit is closed?


✔✔The site must have permanent vegetation, or an equivalent stabilization measure, to prevent

erosion.




What is an example of a structural BMP for stormwater management?


✔✔A retention pond that captures and stores stormwater runoff to prevent flooding and water

quality degradation.




What is the significance of the Virginia Erosion and Sediment Control Law?


✔✔It ensures that land-disturbing activities are properly controlled to minimize soil erosion and

protect water quality.




What is the minimum requirement for maintaining a stormwater management system on a

construction site?


✔✔The system must be inspected regularly, and any necessary maintenance must be performed

to ensure its effectiveness.




When should a Notice of Termination (NOT) be submitted for a construction project?


3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BrilliantScores Chamberlain College Of Nursng
View profile
Follow You need to be logged in order to follow users or courses
Sold
2819
Member since
3 year
Number of followers
2233
Documents
16100
Last sold
1 week ago
latest updated documents, correct, verified & graded A study materials

get bundles, documents, test banks, case studies, shadow health's, ATIs, HESIs, study guides, summary, assignments & every kind of study materials.

3.8

774 reviews

5
388
4
117
3
116
2
37
1
116

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions