100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

API 653 exam Prep Questions & Answers 2024/2025

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
02-12-2024
Written in
2024/2025

API 653 exam Prep Questions & Answers 2024/2025 API 653 defines a "Storage tank engineer" as: A) A registered professional engineer in structural steel fabrication B) Person or organization who is knowledgeable and experienced in the engineering disciplines associated with evaluating the integrity and reliability of aboveground storage tanks C) the engineering department of a contractor who makes repairs to aboveground storage tanks D) A professional engineer who is also an authorized API 653 inspector - ANSWER-B Similar service is means of estimating corrosion rates that: A) Is Seldom used as a means of scheduling internal inspection intervals B) Ignores environmental factors in the determination of corrosion rates C) May be used in addition to or in lieu of actual measurement of corrosion rates D) Is generally considered as the best methodology for establishing the inspection intervals - ANSWER-C Controlled Deposition welding methods, in lieu of PWHT, is limited to: A) P-1 materials B) P-1 and P-3 Materials only C) P-1, P3, and P4 materials only D) P-5A materials - ANSWER-C Inspection hold points, for tank reconstruction, shall be designated by: A) The authorized inspector B) An engineer experienced in storage tank design C) Agreement between tank owner/user and reconstruction contractor D) Agreement between and engineer and the authorized - ANSWER-A All repair and alteration work shall be approved at all designated hold points and after completion: A) Need not be approved if approved will delay work progress B) By the repair organization of the repairs were done according to the specified repair and/or alteration procedures C) By the authorized inspector or experienced storage tank engineer D) By the authorized inspector only - ANSWER-C Alterations to storage tanks, which comply with API 650, must be authorized by: A) The owner/user B) The storage tank engineer C) The authorized inspector D) The repair organization - ANSWER-B A record of non-essential variables used during welding of the test coupon is: A) Optional on the PQR B) Optional on the WPS C) Required on the PQR D) Required on the WPQ - ANSWER-A Cracks is the shell to bottom weld: A) Shall be evaluated per the "As built" Standard B) Shall be removed C) Shall be evaluated on a case bycase basis D) Shall be evaluated per API 579 - ANSWER-B What welding process is most widely used in the repair of process equipment? A) GMAW B) GTAW C) SMAW D) FCAW - ANSWER-C The owner has decided to install a new bottom in an AST. The new bottom will be installed through existing tombstone reinforcing plates. One Method is to remove the lower portion of the reinforcing plate. After the new or replaced section is installed, the splice weld shall: A) Visually examined only B) Magnetic particle examined only C) Liquid penetrate examined only D) Ultrasonic shear wave examined only - ANSWER-B Which of the following is an advantage of thick film reinforced tank bottom lining? A) easier to apply than thin film B) initial cost is typically less than thin film C) Provides greater resistance to moisture ingress permeation D) Generally more accurate MFL floor scans - ANSWER-C The purpose of reviewing the welder performance qualification (WPQ) is to: A) Verify that welder are qualified to perform the welding given its position and process B) Verify that welds made in compliance with the WPS meet requirements C) Verify that the welding procedure specification can produce quality welds D) Verify that welders are qualified to perform the welding, including all essential and nonessential variables - ANSWER-A The recommended type of internal floating roof is the: A) Double Deck B) Annular pontoon C) Pan type D) Single steel deck - ANSWER-B API Publication 2201 on hot tapping and in-service welding covers: A) Welding requirements B) technical aspects C) Inspection requirements D) Safety aspects - ANSWER-D A repair is completed on a nozzle that was originally post weld heat treated(PWHT). It has been determined that PWHT, of the repair, is inadvisable. Who is required to conduct a metallurgical review prior to applying one of the alternative methods permitted in API 653? A) A professional engineer registered in one or more states or provinces of Canada B) A Storage tank engineer C) The Authorized inspector responsible for the repair inspection D) A Metallurgical engineer experienced in alternative PWHT - ANSWER-B What is another term used for "Stray currents"? A) Short circuits B) Positive currents C) Impressed Currents D) Interface currents - ANSWER-D Thick-film linings are commonly reinforced with which of the following? A) Sand and small diameter gravel B) Copper wire, Stainless steel wire, and low alloy steel mesh fabric C)Chopped PVC piping, copped ABS Piping and resin beads D) Woven glass mat, chopped glass fibers, and organic fibers - ANSWER-D How and to what extent are new welds for tank bottom plates required to be examined? A) Newly welded bottom joints shall be tested their entire length using liquid penetrate B) Newly welded bottom joints shall be tested their entire length using a vacuum box and a solution film, or a tracer gas and detector C) Newly welded bottom joints shall be tested their entire length using visual examination D)Newly welded bottom joints shall be tested their entire length using wet fluorescent magnetic particle examination - ANSWER-B According to API 653, no welding is permitted when the temperature of the base metal is below what value? A) Base metal temperature below -20 F B) Base metal temperature below 0 F C) Base metal temperature below 20 F D) Base metal temperature below 30 F - ANSWER-B IF an AST is fabricated of material of unknown toughness and meets the thickness and temperature exemption curve of API 653, the storage tank engineer must con...

Show more Read less
Institution
API 653
Course
API 653











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
API 653
Course
API 653

Document information

Uploaded on
December 2, 2024
Number of pages
33
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
MariaVee

Get to know the seller

Seller avatar
MariaVee Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
1 year
Number of followers
0
Documents
312
Last sold
10 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions