100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

AWS-CWI API-1104 code book with complete verified solutions 2025.

Rating
-
Sold
-
Pages
2
Grade
A
Uploaded on
29-11-2024
Written in
2024/2025

AWS-CWI API-1104 code book with complete verified solutions 2025.

Institution
Codewest -API
Course
Codewest -API








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Codewest -API
Course
Codewest -API

Document information

Uploaded on
November 29, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Codewest Test -API 650 & 653
Questions only
The measurements for internal bottom settlement shall have a maximum of _______
feet spacing between elevation points across the diameter? - answer 10



completed welds of stress relieved assemblies shall be examined by ____ ,after
stress relieving, but before hydrotest - answer MT or PT



vertical shell joints for new replacement shell plates to existing shell plates or
repaired joints in the existing shell plates shall have ____ additional radiograph (s)
taken in each joint - answer 1



the name plate for a reconstructed tank shell have: - answer design conditions
listed



the Min. length of readable RT film according to API 653 is? - answer 6"



when the corrosion rate of a tank is known the interval between taking UT
thickness measurements shall be the smaller of RCA/2N or - answer 15 years



if the corrosion rate is not known , what is the in-service UT interval ? - answer 5
years



general inspection reports shall include - answer metal thicknes measurements,
conditions found, repairs,any settlement measurements,and recommendations



peaking shall not exceed 1/2" when measured with : - answer a horizontal sweep
board 36" long and made to the true outside radius of the tank



routine in service inspection includes : - answer visually checking the exterior
tank's surface for leaks ,shell distortions,signs of settlement,signs of corrosion,
condition of the foundation,condition of the paint, condition of the insulation
system,and condition of appurtenances.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAINBOOSTERS Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
666
Member since
2 year
Number of followers
250
Documents
23197
Last sold
4 days ago

In this page you will find all documents , flashcards and package deals offered by seller BRAINBOOSTERS

4.5

341 reviews

5
265
4
30
3
21
2
5
1
20

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions