You have created an asset master data record. Which other master data record can be
created synchronously?
a) Functional location
b) Cost center
c) Equipment
d) Primary cost element
What does Management Accounting provide? There are 2 correct answers to this
question.
a) Profitability analysis of market segments
b) Information used for internal areas of responsibility
c) Reports that meet accounting standards and principles
d) Account balances for customers and vendors
Which step in the order to cash business process integrates with profitability analysis?
a) Saving a transfer order
b) Generating an invoice
c) Creating an outbound delivery
d) Generating a sales order
At which points in the order-to-cash process are postings made to the general ledger?
There are TWO correct answers for this Question.
a) Posting a goods issue
b) Saving the sales order
c) Saving the invoice
d) Confirming a transfer order
What is document splitting used for?
a) To summarize G/L postings at the controlling area level
b) To update multiple ledgers for parallel accounting
c) To fill the segment characteristic in all line items
d) To summarize CO line items to produce fewer line items
In what step of the purchase-to-pay process is a purchase requisition generated?
,a) Determination of requirements
b) Source of supply determination
c) Vendor selection
d) Invoice verification
Within a MRP net requirements calculation, which of the following are demand
elements? There are 3 correct answers to this question.
a) Purchase order
b) Planned independent requirements
c) Safety stock
d) On hand inventory
e) Sales order
What assigns actual costs to a project?
a) Calculating project interest
b) Saving a purchase order
c) Posting a vendor's invoice
d) Processing a cost forecast
How do you view all records created for an employee?
a) Basic personal data
b) Personnel action
c) Organizational assignment
d) Personnel file
Which of the following functions can result in a creation of reservations for a production
order? There are 2 correct answers to this question.
a) Release production order
b) Convert planned order to production order
c) Record manufacturing activities
d) Calculate production cost
What are some of the trends driving the need for a re-engineered business suite built for
the digital? 3 correct answers
a. Massive increase in device connectivity
b. Business users are taking on more IT tasks
c. Increase in ownership of mobile devices
d. Adoption of cloud computing
Why was the application code completely re-written for SAP S/4 HANA? 2 correct
answers
, a. The optimized ABAP code that we developed for Suite on HANA would not work with
SAP S/4 HANA
b. To take advantage of the simpler data model
c. SAP S/4 HANA is now built with JAVA
d. To ensure that the code is optimized for SAP HANA
SAP S/4 HANA is built to natively integrate with business networks such as
4 correct answers
a. SAP Ariba
b. LinkedIn
c. Concur
d. SAP Fieldglass
e. SAP Hybris
Which characterizes the architecture of a simple application? 2 correct answers
a. Use of dedicated aggregation tables
b. Works with any database
c. Reduction in number of tables
d. No data redundancy
SAP Leonardo builds on SAP's digital transformation framework with the goal of
enabling faster innovation with less risk
a. True
b. False
What are the key functionalities in SAP Cloud Platform? 3 correct answers
a. Open APIs
b. Integration
c. Edge Computing
d. Microservices
Each SAP Fiori app is built around the user, rather than the function
a. True
b. False
The SAP Enterprise Portal is aka the Fiori Framework page
a. True
b. False
The SAP Fiori Launchpad can only be deployed in the SAP Enterprise Portal platform
a. True
b. False