©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e CON 101 Final Exam Questions and Answers 100% Pass In which historical period did we observe the architect as designer, separate from the master builder? - answerThe Renaissance Who invented the first passenger elevator? - answerE.G. Otis The Associated Schools of Construction was organized in what year - answer1965 Which of the following are considered basic sectors of the construction industry? a. Residential b. Industrial c. Healthcare & Education d. Government & Military Construction e. Heavy Civil - answerResidential, Industrial, Heavy Civil Construction Each industry sector is characterized by different means, methods, and materials of construction. They may require different types of equipment, structural framework, materials, and specialty contractors. True or False? - answerTrue ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e Multi-family dwellings refer to apartments, condominiums, and townhouses wherein the entire structure may house multiple, individual residences. True or False? - answerTrue Because the residential market is relatively easy to enter, there are many small companies that are also at risk for high failure. True or false? - answerTrue Common materials used in residential include: a. Engineered Wood Products b. Light-gauge steel framing c. Slate & stone d. Wood framing e. Concrete & Asphalt - answerAll of them Safety I not a priority, it is a: - answervalue The quality control plan consists of a number of inspections, field tests, lab tests, and observations. True or false? - answerTrue ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 3 | P a g e A constructibility review is a design process I which experienced contractors and construction managers work with designers to ensure that the design can actually be built in an efficient and cost-effective manner. True or False? - answerTrue What two dials, or values, are typically the per-view of the owner and architect, NOT the builder. - answerCost and Quality Whereas design-build has linear sequencing of the work, design-bid-build often integrates and overlaps design and constriction activities. True or False? - answerFalse The delivery method is the one in which the owner holds two separate contracts for design and construction services. This method is often referred to as the traditional PDM. - answerDesign-bid-build This hybrid delivery method of Construction Management is one in which the owner bypasses the use of the GC and enters into multiple contracts with trade, or specialty contractors and vendors. - answerMultiple Prime It is the _______ who ultimately decides with PDM to use. - answerowner Which of the following are typical design-build entity configurations? a. Designer and Contractor Partnership ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 4 | P a g e b. Joint Venture c. Cost-Plus free d. Full-service Design-build firm e. Guaranteed Maximum Price (GMP) - answera, b, d Since private projects are not funded by taxpayers, they are required to use an open bidding selection method. True or false? - answerFalse One difference between Agency CM and CM at Risk is that an Agency Construction Manager is not responsible for ensuring that the construction schedule stays on track. True or False? - answerTrue The Field Engineer is associated with what career path? - answerSuperintendent track According to the Hensel-Phelps model in the textbook, which three positions are considered entry level? - answerOffice Engineer, Field Engineer, Quantity Surveyor What are the engineers that are not licensed engineers? - answerField engineer, Project Engineer What project risks are associated with the owner? - answerSite conditions, Project funding

Show more Read less
Institution
CON 101
Course
CON 101











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 101
Course
CON 101

Document information

Uploaded on
November 24, 2024
Number of pages
46
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.




CON 101 Final Exam Questions and Answers
100% Pass

In which historical period did we observe the architect as designer, separate from the master

builder? - answer✔The Renaissance


Who invented the first passenger elevator? - answer✔E.G. Otis


The Associated Schools of Construction was organized in what year - answer✔1965


Which of the following are considered basic sectors of the construction industry?


a. Residential


b. Industrial


c. Healthcare & Education


d. Government & Military Construction


e. Heavy Civil - answer✔Residential, Industrial, Heavy Civil Construction


Each industry sector is characterized by different means, methods, and materials of

construction. They may require different types of equipment, structural framework, materials,

and specialty contractors.


True or False? - answer✔True

1|Page

, ©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
Multi-family dwellings refer to apartments, condominiums, and townhouses wherein the entire

structure may house multiple, individual residences.


True or False? - answer✔True


Because the residential market is relatively easy to enter, there are many small companies that

are also at risk for high failure.


True or false? - answer✔True


Common materials used in residential include:


a. Engineered Wood Products


b. Light-gauge steel framing


c. Slate & stone


d. Wood framing


e. Concrete & Asphalt - answer✔All of them


Safety I not a priority, it is a: - answer✔value


The quality control plan consists of a number of inspections, field tests, lab tests, and

observations.


True or false? - answer✔True




2|Page

, ©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
A constructibility review is a design process I which experienced contractors and construction

managers work with designers to ensure that the design can actually be built in an efficient and

cost-effective manner.


True or False? - answer✔True


What two dials, or values, are typically the per-view of the owner and architect, NOT the

builder. - answer✔Cost and Quality


Whereas design-build has linear sequencing of the work, design-bid-build often integrates and

overlaps design and constriction activities.


True or False? - answer✔False


The delivery method is the one in which the owner holds two separate contracts for design and

construction services. This method is often referred to as the traditional PDM. -

answer✔Design-bid-build


This hybrid delivery method of Construction Management is one in which the owner bypasses

the use of the GC and enters into multiple contracts with trade, or specialty contractors and

vendors. - answer✔Multiple Prime


It is the _______ who ultimately decides with PDM to use. - answer✔owner


Which of the following are typical design-build entity configurations?


a. Designer and Contractor Partnership



3|Page

, ©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
b. Joint Venture


c. Cost-Plus free


d. Full-service Design-build firm


e. Guaranteed Maximum Price (GMP) - answer✔a, b, d


Since private projects are not funded by taxpayers, they are required to use an open bidding

selection method.


True or false? - answer✔False


One difference between Agency CM and CM at Risk is that an Agency Construction Manager is

not responsible for ensuring that the construction schedule stays on track.


True or False? - answer✔True


The Field Engineer is associated with what career path? - answer✔Superintendent track


According to the Hensel-Phelps model in the textbook, which three positions are considered

entry level? - answer✔Office Engineer, Field Engineer, Quantity Surveyor


What are the engineers that are not licensed engineers? - answer✔Field engineer, Project

Engineer


What project risks are associated with the owner? - answer✔Site conditions, Project funding




4|Page

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
601
Member since
1 year
Number of followers
178
Documents
24050
Last sold
3 hours ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

120 reviews

5
57
4
21
3
21
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions