PJM Generation Dispatcher Exam Practice Questions and Answers 100% Pass An EXCITER on a traditional generator does what? - ANSWER-Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - ANSWER-Limits When synchronizing to the interconnection, what needs to be synchronized? - ANSWER-Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - ANSWER-10A or greater is measured by special equipment at Missouri Ave or Meadowbrook and the measurement is confirmed by one of the following other sources: Excess transformer current @ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements on transformers @ Hopw Creek or Salem nuclear subs, or high DC measurements @ Limerick or Peach Bottom. What are the 2 types of National Terrorism Advisory Alerts? - ANSWER-Elevated and Imminent. Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/8 What action does PJM take for a terrorist attack, fuel delivery emergency, or GMD's? - ANSWER-Conservative Operations What does PJM put the most emphasis on during a terrorist/sabotage event? - ANSWER-Operations and Communications What does PJM request during a low voltage alert? - ANSWER-RRC - reactive reserve check PJM issues a Heavy Load Voltage Warning how many hours prior to implementation? - ANSWER-4 hours What should generation owners/operators do during a High System Voltage Action? - ANSWER-Operate at the lower bandwidth of the voltage schedule. How many hours do you have to report a 24-hr reportable NERC disturbance? - ANSWER-6 hours What report is generated during a Max Emergency Gen Alert? - ANSWER-SSR - Supplementary Status Report What part of the SSR is the Fuel Limited Resources accounted for? - ANSWER-Part G Resource Limited Units which are units that are

Show more Read less
Institution
PJM Generation Dispatcher
Course
PJM Generation Dispatcher









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation Dispatcher
Course
PJM Generation Dispatcher

Document information

Uploaded on
November 19, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Generation Dispatcher Exam Practice
Questions and Answers 100% Pass

An EXCITER on a traditional generator does what? - ANSWER✔✔-Voltage regulation

(AVR) if you change the excitation current, you change the voltage.


ECO Min, ECO Max, and EMERG Max are genrator _________________. -

ANSWER✔✔-Limits


When synchronizing to the interconnection, what needs to be synchronized? -

ANSWER✔✔-Frequency, Voltage, and phase angle.


GMD (GeoMagnetic Disturbance) procedure is implemented when? - ANSWER✔✔-10A

or greater is measured by special equipment at Missouri Ave or Meadowbrook and the

measurement is confirmed by one of the following other sources: Excess transformer

current @ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements

on transformers @ Hopw Creek or Salem nuclear subs, or high DC measurements @

Limerick or Peach Bottom.


What are the 2 types of National Terrorism Advisory Alerts? - ANSWER✔✔-Elevated

and Imminent.




Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/8

, What action does PJM take for a terrorist attack, fuel delivery emergency, or GMD's? -

ANSWER✔✔-Conservative Operations


What does PJM put the most emphasis on during a terrorist/sabotage event? -

ANSWER✔✔-Operations and Communications


What does PJM request during a low voltage alert? - ANSWER✔✔-RRC - reactive

reserve check


PJM issues a Heavy Load Voltage Warning how many hours prior to implementation? -

ANSWER✔✔-4 hours


What should generation owners/operators do during a High System Voltage Action? -

ANSWER✔✔-Operate at the lower bandwidth of the voltage schedule.


How many hours do you have to report a 24-hr reportable NERC disturbance? -

ANSWER✔✔-6 hours


What report is generated during a Max Emergency Gen Alert? - ANSWER✔✔-SSR -

Supplementary Status Report


What part of the SSR is the Fuel Limited Resources accounted for? - ANSWER✔✔-Part

G Resource Limited Units which are units that are not able to run at max capacity for

more than 72 hours.


What kind of Emergency Procedures occur during real time operating hours? -

ANSWER✔✔-Actions

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/8

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SophiaBennett Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
131
Member since
1 year
Number of followers
5
Documents
9104
Last sold
4 days ago
EXAM GAME-CHANGER

Exam Questions and Answers Section : Study Like a Pro, Study Smart, Study with Sophia.

3.7

26 reviews

5
10
4
5
3
7
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions