PJM Generation Dispatch Exam Questions and Answers 100% Pass Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. - ANSWER-C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO During black start restoration, priority access to cranking power should be given to: A) Hot units that can return to service immediately. B) Combustion turbines in areas where the initial disturbance occurred Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/88 C)Units with black start capability D) Hydro Units - ANSWER-A) Hot units that can return to service immediately. During a restoration, if you are presented with the opportunity to re-connect with the Eastern Interconnection, you should: A)Not pursue this opportunity because you may cause the Eastern Interconnection to become unstable. B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system C) Pursue this opportunity as quickly as possible D) Pursue this opportunity only if you need cranking power for your generating unity - ANSWER-C) Pursue this opportunity as quickly as possible Complete (Total System) Blackouts are characterized by which of the following? 1 - Most common type of blackout 2 - May require coordinating multiple islands 3 - Likely to result in Transmission overloads or other issues 4 - Affects a very large geographical area, and many customers Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/88 5 - Most commonly caused by human or switching errors A) 1 & 3 B) 2 & 4 C) 3 & 5 D) 1 - ANSWER-B) 2 & 4 The first step in a system restoration would be to: A) Immediately notify the media of the event B) Restore as much of the area load as possible C) Restore as much under-frequency load as possible D) Verify that communication is functional with your neighbors - ANSWER-D) Verify that communication is functional with your neighbors Why would an offsite power to generating facilities be a priority during the restoration process? A) To provide safe shutdown power for the units B) To meet FERC requirements Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 4/88 C) To provide adequate lighting for the plant operators to attempt a restart D) To prepare and expedite the return of the unit - ANSWER-D) To prepare and expedite the return of the unit Factors that help determine the sequence of restoration of off-line generation include (Pick 2): -Generation Type -Unloaded Capacity -Unit Availability -Stability of the Generator - ANSWER--Generation Type -Unit Availability How often should a Transmission company file an updated restoration report with PJM? 1 - Every 30 minutes 2 - Every hour 3 - Every 10 lines that have been restored 4 - Every 5 lines that have been restored Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 5/88 A) 1 & 4 B) 2 & 3 C) 1 & 3 D) 2 & 4 - ANSWER-C) 1 & 3 Which of the following statements are true concerning delays in restoring auxiliary power to off-line generation? 1 - The unit could suffer turbine shaft damage 2 - The fuel oil for the unit could congeal 3 - The startup time for the unit will be reduced 4 - The battery life used to maintain critical systems may run out A) 1, 2 and 3 B) 1, 2 and 4 C) 1, 3 and 4 D) 2, 3 and 4 - ANSWER-B) 1, 2 and 4

Show more Read less
Institution
PJM Generation Dispatcher
Course
PJM Generation Dispatcher











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation Dispatcher
Course
PJM Generation Dispatcher

Document information

Uploaded on
November 19, 2024
Number of pages
88
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Generation Dispatch Exam
Questions and Answers 100% Pass

Which of the following statements is correct concerning PJM assuming frequency

control of the restoration process?




A) PJM assumes control once an external transmission tie has been established.


B) Once an Area Control Error can be calculated, PJM will assume control.


C) Whenever it becomes too much of a burden for any one Transmission Owner within

the RTO


D) Whenever the Transmission Owners within the RTO agree to let PJM control the

process. - ANSWER✔✔-C) Whenever it becomes too much of a burden for any one

Transmission Owner within the RTO


During black start restoration, priority access to cranking power should be given to:




A) Hot units that can return to service immediately.


B) Combustion turbines in areas where the initial disturbance occurred



Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/88

,C)Units with black start capability


D) Hydro Units - ANSWER✔✔-A) Hot units that can return to service immediately.


During a restoration, if you are presented with the opportunity to re-connect with the

Eastern Interconnection, you should:




A)Not pursue this opportunity because you may cause the Eastern Interconnection to

become unstable.


B) Pursue this opportunity only when you have adequate Dynamic Reserves on your

system


C) Pursue this opportunity as quickly as possible


D) Pursue this opportunity only if you need cranking power for your generating unity -

ANSWER✔✔-C) Pursue this opportunity as quickly as possible


Complete (Total System) Blackouts are characterized by which of the following?




1 - Most common type of blackout


2 - May require coordinating multiple islands


3 - Likely to result in Transmission overloads or other issues


4 - Affects a very large geographical area, and many customers


Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/88

,5 - Most commonly caused by human or switching errors




A) 1 & 3


B) 2 & 4


C) 3 & 5


D) 1 - ANSWER✔✔-B) 2 & 4


The first step in a system restoration would be to:




A) Immediately notify the media of the event


B) Restore as much of the area load as possible


C) Restore as much under-frequency load as possible


D) Verify that communication is functional with your neighbors - ANSWER✔✔-D)

Verify that communication is functional with your neighbors


Why would an offsite power to generating facilities be a priority during the restoration

process?




A) To provide safe shutdown power for the units


B) To meet FERC requirements
Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/88

, C) To provide adequate lighting for the plant operators to attempt a restart


D) To prepare and expedite the return of the unit - ANSWER✔✔-D) To prepare and

expedite the return of the unit


Factors that help determine the sequence of restoration of off-line generation include

(Pick 2):




-Generation Type


-Unloaded Capacity


-Unit Availability


-Stability of the Generator - ANSWER✔✔--Generation Type


-Unit Availability


How often should a Transmission company file an updated restoration report with

PJM?




1 - Every 30 minutes


2 - Every hour


3 - Every 10 lines that have been restored


4 - Every 5 lines that have been restored

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 4/88

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SophiaBennett Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
131
Member since
1 year
Number of followers
5
Documents
9104
Last sold
4 days ago
EXAM GAME-CHANGER

Exam Questions and Answers Section : Study Like a Pro, Study Smart, Study with Sophia.

3.7

26 reviews

5
10
4
5
3
7
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions