- II (SE Handbook Ch.5) with Correct
Answers 100% Pass
Per IEEE 15288, "[6.3] The Technical Management Processes are used to - ANSWER✔✔-
establish and evolve plans, to execute the plans, to assess actual achievement and the
progress against the plans and to control execution through fulfillment. Individual
Technical Management Processes may be invoked at any time in the life cycle and at
any level..."
List the processes included in Technical Management - ANSWER✔✔-○ Project Planning
○ Project Assessment and Control
○ Decision Management
○ Risk Management
○ Configuration Management
○ Information Management
○ Measurement
○ Quality Assurance
Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/22
,Per IEEE 15288, "[6.3.1.1] The purpose of the Project Planning process is... -
ANSWER✔✔-to produce and coordinate effective workable plans."
The Project planning process starts with... - ANSWER✔✔-the identification of a new
potential project and continues after the authorization and activation until its
termination
What does the Project planning process establish? - ANSWER✔✔-It establishes the
direction and infrastructure necessary to enable the assessment and control of the
project and IDs the details of the work and the right set of personnel, skills, and
facilities with a schedule for needed resources
Top-level plan for managing the SE effort - ANSWER✔✔-SEMP
Defines organization, structure, and conducted and how the total engineering process
will be controlled to provide a product that satisfies requirements - ANSWER✔✔-SEMP
An essential part of SEMP and tool for project control because it IDs the critical path of
technical activities in the project - ANSWER✔✔-SEMS
A tool used for project control and the extent to which TPMs will be employed should
be defined in the SEMP - ANSWER✔✔-TPMs (5.7.2.8)
Involves defining the SE processes, functional analysis approaches, what trade studies
will be included in the project, schedule, and organizational roles and responsibilities -
ANSWER✔✔-SEMP
Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/22
, SEMP should include info about... - ANSWER✔✔-○ Organization of the project and
how SE interfaces with organization
○ Key position responsibilities
○ Clear boundaries and scope
○ Assumptions and constraints
○ Key tech objectives
○ Infrastructure support and resource management
○ Approach and methods used for planning and executing tech management process
○ Approach and methods used for planning and executing specialty engineering
process
SEMP should include plans for training for the customer which should include: -
ANSWER✔✔-○ Analysis of performance
○ Behavior deficiencies or shortfalls
○ Required training to remedy deficiencies or shortfalls
○ Schedule to achieve required proficiencies
Per IEEE 15288, "[6.3.2.1] The purpose of the Project Assessment and Control process is
to... - ANSWER✔✔-assess if the plans are aligned and feasible; determine the status of
the project, technical and process performance; and direct execution to ensure that the