Advance Rigger Test | Questions and Answers | Latest Update 2024/2025 | 100% PASS
Advance Rigger Test | Questions and Answers | Latest Update 2024/2025 | 100% PASS What is meant by the term "two blocking" - Answer -The load block contacts the boom point sheaves Lifting 20,000 pound with a 2-leg bridle sling at 30% horizontal sling angle, what is the force applied to each leg. - Answer -20,000 pound In multiple crane lifts using an equalizer beam, the weight of the beam should be considered. - Answer -Part of the load weight What is required if there is a deviation from the lift plan. - Answer -A new lift plan On level ground using skids and roilers, what percent of the load should yield the required line pull as a general rule of thumb. - Answer -5% All of the following are results of unbalanced reeving of the hook block EXCEPT. - Answer -Wear on the hook Before a spreader bar or beams can be used they Must have been. - Answer -tested and approved When materials are being hoisted to an upper level, a tag line is used to. - Answer -Help control the loadTwo cranes are lifting 100 tons . If crane A has 40% of the load,
Written for
- Institution
- Rigging practices
- Course
- Rigging practices
Document information
- Uploaded on
- November 14, 2024
- Number of pages
- 6
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- advance rigger test 2024
- advance rigger test 2025
-
what is meant by the term two blocking answer
Also available in package deal