Name: Score:
87 Multiple choice questions
Term 1 of 87
48. What is the Executive Order VR 201-A says can be the failure of a spout test on Healy 900
nozzle?
Spout O-rings
Gasoline
Inch Water Column
J/b Kwik
Term 2 of 87
14 A ___ is a component of the hanging hardware that separates when it's applied a force?
Pneumatic.
Breakaway.
Tank And Connected Pipping
To Preserve The Air.
Term 3 of 87
15. UL listed means all except :
Worldwide Approved.
Bond
Delivery Of Gasoline And Ust.
Excavation Cave-ins.
,Term 4 of 87
44. In a gasoline vapor Vac a OPW 12 VW nozzle is considered defective if ___ of the
circumference of the vapor escape gaurd is missing or damaged?
25 percent.
50 percent.
90 percent.
75 percent.
Term 5 of 87
43. What is true about spill buckets?
Only able to store water, not fuel.
Can store fuel indefinitely without issues.
Can store fuel for up to a year.
Not able to store fuel for a long period of time.
Term 6 of 87
54. The best time to verify with local agencies that vapor recovery equipment meets all applicable
requirements is?
Before begging the installation
Spill bucket
Monitoring equipment
Flammability
, Term 7 of 87
71. A ___ is installed on the vent riser to prevent vapors from escaping or entering the system
unless a pressure or vacuum condition exist that exceeds the design opening pressure or vacuum
limit of the cap?
Spout o-rings
P/v valve
P/V cap
Shear valve
Term 8 of 87
Overfill protection is designed to prevent the tank from being over filled during product delivery
by
Allowing product to flow freely without any restrictions.
Increasing the pressure in the tank to enhance product delivery.
Monitoring the temperature of the product during delivery.
Restricting product flow, triggering an audible and visual alarm, stopping product flow.
Term 9 of 87
75. Vacuum assist system nozzles may be identified by all of the following except?
Shear valve
Large bellows
Monitoring equipment
Spout o-rings
87 Multiple choice questions
Term 1 of 87
48. What is the Executive Order VR 201-A says can be the failure of a spout test on Healy 900
nozzle?
Spout O-rings
Gasoline
Inch Water Column
J/b Kwik
Term 2 of 87
14 A ___ is a component of the hanging hardware that separates when it's applied a force?
Pneumatic.
Breakaway.
Tank And Connected Pipping
To Preserve The Air.
Term 3 of 87
15. UL listed means all except :
Worldwide Approved.
Bond
Delivery Of Gasoline And Ust.
Excavation Cave-ins.
,Term 4 of 87
44. In a gasoline vapor Vac a OPW 12 VW nozzle is considered defective if ___ of the
circumference of the vapor escape gaurd is missing or damaged?
25 percent.
50 percent.
90 percent.
75 percent.
Term 5 of 87
43. What is true about spill buckets?
Only able to store water, not fuel.
Can store fuel indefinitely without issues.
Can store fuel for up to a year.
Not able to store fuel for a long period of time.
Term 6 of 87
54. The best time to verify with local agencies that vapor recovery equipment meets all applicable
requirements is?
Before begging the installation
Spill bucket
Monitoring equipment
Flammability
, Term 7 of 87
71. A ___ is installed on the vent riser to prevent vapors from escaping or entering the system
unless a pressure or vacuum condition exist that exceeds the design opening pressure or vacuum
limit of the cap?
Spout o-rings
P/v valve
P/V cap
Shear valve
Term 8 of 87
Overfill protection is designed to prevent the tank from being over filled during product delivery
by
Allowing product to flow freely without any restrictions.
Increasing the pressure in the tank to enhance product delivery.
Monitoring the temperature of the product during delivery.
Restricting product flow, triggering an audible and visual alarm, stopping product flow.
Term 9 of 87
75. Vacuum assist system nozzles may be identified by all of the following except?
Shear valve
Large bellows
Monitoring equipment
Spout o-rings