PJM Generation Operation Exam 2024 Questions with
100% Correct Answers | Verified | Latest Update 2024
| 100% pass
Real time real and reactive power telemetry: Solar parks __MW (Maximum
Facility Output) or greater - ✔✔3 MW
Real time real and reactive power telemetry: Distributed generators modeled less
than __ MW (Maximum Facility Output) - ✔✔10 MW
Real time real and reactive power telemetry: Public... - ✔✔Distribution
Microgrid Generators
Real time real and reactive power telemetry: Generators that will also participate as
PJM _____________ when they will reduce load and have PJM-approved
interconnection rights to inject power. - ✔✔Demand Response Resources
, What are the real-time data requirements for a Mixed Technology Facility that is
directly connected to PJM transmission and has a Maximum Facility Output of
75MW or greater, or otherwise is a BES generator? - ✔✔MW and MVAR must
be measured at the high-side of the generator step-up transformer. If the
transformer is modeled in the PJM EMS (e.g., for units 20MW and greater), MW
and MVAR must also be measured at the low-side of the generator step-up
transformer
If a unit's commit status is set to Must Run it indicates that the generating unit
is... - ✔✔self-scheduling. The unit must be committed.
When is the DA market rebid period? - ✔✔1330-1415
Resources that are opted-in to intraday offers may make changes beginning... -
✔✔at 1830 the previous day up to 65 minutes before the operating hour
100% Correct Answers | Verified | Latest Update 2024
| 100% pass
Real time real and reactive power telemetry: Solar parks __MW (Maximum
Facility Output) or greater - ✔✔3 MW
Real time real and reactive power telemetry: Distributed generators modeled less
than __ MW (Maximum Facility Output) - ✔✔10 MW
Real time real and reactive power telemetry: Public... - ✔✔Distribution
Microgrid Generators
Real time real and reactive power telemetry: Generators that will also participate as
PJM _____________ when they will reduce load and have PJM-approved
interconnection rights to inject power. - ✔✔Demand Response Resources
, What are the real-time data requirements for a Mixed Technology Facility that is
directly connected to PJM transmission and has a Maximum Facility Output of
75MW or greater, or otherwise is a BES generator? - ✔✔MW and MVAR must
be measured at the high-side of the generator step-up transformer. If the
transformer is modeled in the PJM EMS (e.g., for units 20MW and greater), MW
and MVAR must also be measured at the low-side of the generator step-up
transformer
If a unit's commit status is set to Must Run it indicates that the generating unit
is... - ✔✔self-scheduling. The unit must be committed.
When is the DA market rebid period? - ✔✔1330-1415
Resources that are opted-in to intraday offers may make changes beginning... -
✔✔at 1830 the previous day up to 65 minutes before the operating hour