,1. In Lean methodology, which of the following is not a principle of
the 5S tool?
a) Sort
b) Systematize
c) Sustain
d) Synergize
Answer: d) Synergize
Rationale: The 5S principles include Sort, Set in order, Shine,
Standardize, and Sustain. Synergize is not a part of the 5S
principles; it is often associated with collaborative efforts in team
environments.
2. When applying Jobs-To-Be-Done theory, what is the primary
focus?
a) The demographics of the customer
b) The technologies used by the company
c) The tasks that customers are trying to accomplish
d) The price point of the product
Answer: c) The tasks that customers are trying to accomplish
Rationale: Jobs-To-Be-Done theory focuses on understanding the
jobs or tasks that customers are trying to get done, rather than
demographics or technologies, which are secondary considerations.
©2024/2025
,3. Which stage of the Design Thinking process involves generating
a wide range of ideas?
a) Empathize
b) Define
c) Ideate
d) Prototype
Answer: c) Ideate
Rationale: The Ideate stage is where a wide range of ideas are
generated, which can then be refined and prototyped in subsequent
stages.
4. In the context of Lean methodology, what does 'Gemba' refer
to?
a) A documentation of the manufacturing process
b) The actual place where value is created
c) A form of waste
d) A managerial position
Answer: b) The actual place where value is created
Rationale: Gemba refers to the actual place where value is
created in the Lean methodology, emphasizing the importance of
understanding the work floor and direct observation.
©2024/2025
, 5. What is a key benefit of applying the Jobs-To-Be-Done theory in
product development?
a) Increased production speed
b) Better alignment with customer needs
c) Reduced marketing costs
d) Simplified product design
Answer: b) Better alignment with customer needs
Rationale: Jobs-To-Be-Done theory helps in aligning products
with the actual needs of customers by focusing on the tasks they are
trying to accomplish.
6. During which phase of Design Thinking is user feedback
primarily collected?
a) Empathize
b) Define
c) Ideate
d) Test
Answer: d) Test
Rationale: User feedback is primarily collected during the Test
phase, where prototypes are evaluated by users, and insights are
gathered to refine the solutions.
7. What does the 'Pull' system in Lean methodology signify?
©2024/2025