ELEMENT DESCRIPTION (Sheet 1)
Location:
Activity: Event Present Proposed Savings
Date: Operation
Operator
Analyst: Transport
:
Circle appropriate method & type: Delay
Method: Present Proposed Inspection
Type: Worker Material machine Storage
Remarks:
Time: Seconds
Distance: Meters
FULL DESCRIPTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Flow Process Chart (Sheet 2)
Location: SUMMARY
Location:
Activity: Event Present Proposed Savings
Date: Operation
Operator
Analyst: Transport
:
Circle appropriate method & type: Delay
Method: Present Proposed Inspection
Type: Worker Material machine Storage
Remarks:
Time: Seconds
Distance: Meters
FULL DESCRIPTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Flow Process Chart (Sheet 2)
Location: SUMMARY