Your time: 1 min
Correct 0
TCEQ class
0%
c water
Incorrect 158 license exam 2024
Next steps
Already Passed!!
158 missed terms
Practice terms in Learn Take a new test
Practice your missed terms Try another test to boost
more until you get them your confidence.
right.
Your answers
1 of 158
Term
TCEQ requires notification from the operator if changes to the public
water system occur such as
Give this one a try later!
, Change in staff, budget, or Change in water source, water
equipment quality, or health hazards
Change in policy, management, or
Change in location, size, or color
hours
Don't know?
2 of 158
Term
A groundwater well is currently producing 1.4 MGD. Calculate and
convent 1.4 MGD to GPM
Give this one a try later!
1,000 feet Aquifers
500 972 gpm
Don't know?
3 of 158
Term
,A groundwater well is currently pumping 1,000 gallons per minute.
Convert 1,000 gpm to million gallons per day (MGD)
Give this one a try later!
2.00 Mgd 1.44 MGD
3.00 Mgd 0.75 Mgd
Don't know?
4 of 158
Term
Physical characteristics of water include
Give this one a try later!
Corrosion level, Ph, color, and
Temperature, ph, odor, color
turbidity
Taste, odor, Color, turbidity,
Cause mudballs and filter plugging
and temperature
Don't know?
, 5 of 158
Term
TCEQ requires community water systems to have a minimum
production capacity of _______ per connection at peak demand
Give this one a try later!
0.8 gpm 0.6 gpm
0.3 gpm 1.0 gpm
Don't know?
6 of 158
Term
If a water lubricated vertical turbine pump is started by dry bearings
Give this one a try later!
The pump will operate more
The bearings will be damaged
efficiently
The bearings will self-lubricate The pump will increase its flow rate