100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NCCER module 3 Questions and Answers 100% Pass

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
04-11-2024
Written in
2024/2025

NCCER module 3 Questions and Answers 100% Pass

Institution
Nccco
Course
Nccco









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nccco
Course
Nccco

Document information

Uploaded on
November 4, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCCO tower exam | Questions and
answers with 100% correct solutions |
A+ Grade

On a self - erecting tower crane , which of the following is included in the set up ?
✔✔Preparing foundation or ground compaction




On a self-erecting tower crane , which of the following is included in the erection process
? ✔✔Unfolding




What should be done if the radio remote is left unattended ✔✔De-energize crane and remove key or
place control in a lock box




If the operator is qualified to operate the self erecting tower crane , he can also erect and dismantle the
crane ✔✔False




Where shall a fire extinguisher , with a minimum 10ABC classification be installed on a tower crane ?
✔✔In the cab or at the machinery housing




Where should tools be kept on a crane when they are not being used ? ✔✔Toolbox




List 2 functions that increase the load radius ✔✔Trolley out and swing




Which item below weighs 490 pounds per cubic foot ? ✔✔Steel

, When the load is _____ or more of maximum line pull the operator must test the brakes of the crane by
lifting the load a few inches and applying the brakes ✔✔90%




The Tower crane must be equipped with an audible signal device. (Horn) ✔✔True




Frequent inspections are daily to monthly and periodic inspections are monthly to yearly ✔✔True




When are personnel allowed under a self erecting tower crane during erection ? ✔✔Locked in position




Personnel may ride the hook or load wearing a full body harness ✔✔False




Define rather capacities ✔✔Total load that can be lifted with tower crane




Unused wire rope should be pulled off and load tested to ✔✔10%




Hooks should be removed from service if any wear exceeds _________ of the original section
dimensions or as recommended by the manufacture ✔✔10%




Hooks should be removed from service if an increase in the throat exceeds ___ or as recommended by
the manufacture ✔✔5%




On a tower crane , the capacity can be increased by _______ ✔✔Trolley in

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER New York College Of Dentistry
View profile
Follow You need to be logged in order to follow users or courses
Sold
342
Member since
2 year
Number of followers
104
Documents
38404
Last sold
2 days ago

3.4

57 reviews

5
25
4
8
3
7
2
1
1
16

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions