100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ARE 5.0 – PJM QUESTIONS WITH COMPLETE VERIFIED ANSWERS [ GRADED A+]

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
04-11-2024
Written in
2024/2025

ARE 5.0 – PJM QUESTIONS WITH COMPLETE VERIFIED ANSWERS [ GRADED A+] Constructability reviews - reviewing the design (and drawings) to identify problems that might me the project difficult/impossible to construct asking the questions "Will this impact the cost, time, or quality of the project?" and "Will the contractor, or subcontractors, require an answer to this question in order to perform their work?" So from that it seems that it should also be looking for gaps in the documents.

Show more Read less
Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
November 4, 2024
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ARE 5.0 – PJM QUESTIONS WITH

COMPLETE VERIFIED ANSWERS [

GRADED A+]




Constructability reviews - ✔✔reviewing the design (and drawings) to

identify problems that might me the project difficult/impossible to

construct

asking the questions "Will this impact the cost, time, or quality of the

project?" and "Will the contractor, or subcontractors, require an

answer to this question in order to perform their work?" So from that it

seems that it should also be looking for gaps in the documents.

,differences between contingency for design vs contingency for the

entire project vs contingency held by the contractor. Also look at when

design fees are percentage of construction cost based how they are (or

aren't) affected by contingency. - ✔✔


1 yd = - ✔✔3 ft


1 yd2 - ✔✔9 ft2


1 yd3 - ✔✔27 ft3


1 acre = ? square feet - ✔✔43,560 square feet


1 acre = - ✔✔4840 yards


Bid requirements - ✔✔Bid solicitation


Instructrions to bidders

Info available to bidders

Bid forms and supplements


Contract forms - ✔✔Agreement

, Performance bond

Payment bond

Certificate


Conditions of the contract - ✔✔General


Supplementary


Specifications - ✔✔Div 1. Gral requirements


Div 2. Site construction

Div 3. Concrete

Div 4. Masonry

Div 5. Metals

Div 6. Wood & plastics

Div 7. Thermal & moisture protection

Div 8. Doors and windows

Div 9. Finishes
$10.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
morren

Get to know the seller

Seller avatar
morren Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
3 year
Number of followers
2
Documents
1269
Last sold
1 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions