1 meter = 3.28 ft = ____ inches - ANSWER 39.37 inches
1 sq ft = ____ sq in - ANSWER 144 sq in
1 sq yd = ___ sq ft - ANSWER 9 sq ft
1 acre = ______ square feet - ANSWER 43,560 square feet
1 sq mile = ____ acres - ANSWER 640 acres
1 cu ft = ____ cu in - ANSWER 1728 cu in
1 cu yd = ___ cu ft - ANSWER 27 cu ft
1 cu ft of sand ~= _ _ lbs - ANSWER 100 lbs
1 roofing square = ___ sq ft - ANSWER 100 sq ft
Area of a Rectangle = - ANSWER base x height
are of a square = - ANSWER s * s = s^2
The area of a triangle equals - ANSWER half the product of a base and the height to that base (A=1/2bh)
, area of a trapezoid equals - ANSWER Half the product of the height and the sum of the bases ((a+b)/2)*h
Circumference = - ANSWER pi x diameter = 2*pi*r
area of a circle equals - ANSWER 2(pi) * r^2
Volume of a cube equals - ANSWER V = s*s*s
Volume of a rectangle equals - ANSWER v = b * h * d
Volume of a cylinder equals - ANSWER (pi) * (r^2) * h
Special Detailed requirements on use and occupancy:
Every required exit doorway must be large enough to allow the installation of a door with minimum
dimensions of __(width) x __(height). Once installed exit doors must be capable of opening so that the
clear width of the exit is at least ____ inches. - ANSWER 3 feet 0 inches(width) , 6 feet 8 inches(height) ;
32 inches
A local building department may __________ an applicant for a ________ to submit plans and
specifications for _________. Once approved, one set of plans and specifications must be _______ on
file by the department for up to _____ after completion of the project. The department must also, upon
approval, return a set of the plans and specifications to the applicant. This second set must be kept at
the jobsite during the entire project. Every permit issued will become invalid if the work authorized was
not begun within ________ days after the date the permit was issued, or if the worksite has been
abandoned for a period of _______ days then the permit will be ________. - ANSWER require, building
permit, approval, kept, 90, 180 , 180, suspended.
Generally, buildings have at least ____ per story. - ANSWER one exit
Dwelling must have at least _____ when the occupant load is 10 or more. - ANSWER two exits
If the occupant load for the second or any other story of a building 501 to 1000, there must be at least
_______ exits. - ANSWER three
100% ACCURATE
1 meter = 3.28 ft = ____ inches - ANSWER 39.37 inches
1 sq ft = ____ sq in - ANSWER 144 sq in
1 sq yd = ___ sq ft - ANSWER 9 sq ft
1 acre = ______ square feet - ANSWER 43,560 square feet
1 sq mile = ____ acres - ANSWER 640 acres
1 cu ft = ____ cu in - ANSWER 1728 cu in
1 cu yd = ___ cu ft - ANSWER 27 cu ft
1 cu ft of sand ~= _ _ lbs - ANSWER 100 lbs
1 roofing square = ___ sq ft - ANSWER 100 sq ft
Area of a Rectangle = - ANSWER base x height
are of a square = - ANSWER s * s = s^2
The area of a triangle equals - ANSWER half the product of a base and the height to that base (A=1/2bh)
, area of a trapezoid equals - ANSWER Half the product of the height and the sum of the bases ((a+b)/2)*h
Circumference = - ANSWER pi x diameter = 2*pi*r
area of a circle equals - ANSWER 2(pi) * r^2
Volume of a cube equals - ANSWER V = s*s*s
Volume of a rectangle equals - ANSWER v = b * h * d
Volume of a cylinder equals - ANSWER (pi) * (r^2) * h
Special Detailed requirements on use and occupancy:
Every required exit doorway must be large enough to allow the installation of a door with minimum
dimensions of __(width) x __(height). Once installed exit doors must be capable of opening so that the
clear width of the exit is at least ____ inches. - ANSWER 3 feet 0 inches(width) , 6 feet 8 inches(height) ;
32 inches
A local building department may __________ an applicant for a ________ to submit plans and
specifications for _________. Once approved, one set of plans and specifications must be _______ on
file by the department for up to _____ after completion of the project. The department must also, upon
approval, return a set of the plans and specifications to the applicant. This second set must be kept at
the jobsite during the entire project. Every permit issued will become invalid if the work authorized was
not begun within ________ days after the date the permit was issued, or if the worksite has been
abandoned for a period of _______ days then the permit will be ________. - ANSWER require, building
permit, approval, kept, 90, 180 , 180, suspended.
Generally, buildings have at least ____ per story. - ANSWER one exit
Dwelling must have at least _____ when the occupant load is 10 or more. - ANSWER two exits
If the occupant load for the second or any other story of a building 501 to 1000, there must be at least
_______ exits. - ANSWER three