100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

North Carolina General Contractors Exam CORRECT QUESTIONS & ANSWERS(GRADED A)

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
02-11-2024
Written in
2024/2025

Shear wall - ANSWER A wall designed to resist lateral forces parallel to the plane Of a wall. The private garage shall be separated from the dwelling unit and its attic area by means of a minimum ____ inch gypsum. - ANSWER 1/2" Become familiar with all types Of construction I-V. Become familiar with Table 601 for the exam. - ANSWER Bolt heads must not be closer than ____ to the edge Of fireproofing. - ANSWER 1"

Show more Read less
Institution
Contractors License
Course
Contractors license









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Contractors license
Course
Contractors license

Document information

Uploaded on
November 2, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

North Carolina General Contractors Exam
CORRECT QUESTIONS & ANSWERS(GRADED A)

Shear wall - ANSWER A wall designed to resist lateral forces parallel to the plane Of a

wall.



The private garage shall be separated from the dwelling unit and

its attic area by means of a minimum ____ inch gypsum. - ANSWER 1/2"



Become familiar with all types Of construction I-V.

Become familiar with Table 601 for the exam. - ANSWER



Bolt heads must not be closer than ____ to the edge Of fireproofing. - ANSWER 1"



The height of the parapet firewall shall not be less than ____ above the point where the roof surface and
the wall intersect. - ANSWER 30"



The clearance between the ends of combustible members in a

firewall must be ____. - ANSWER 4"



You may use combustible roof insulation if the roof covering is

____ ____to the insulation. - ANSWER applied directly



NO. 18 SWG steel tie wires spaced ____ on

center. - ANSWER 24"



Be able to determine finish requirements using this table.

, 805.1.1; Know the requirements for fire-blocking to be constructed using combustible materials. -
ANSWER



Combustible insulating boards not more than ____ thick and

covered with finish flooring are permitted where attached directly to a non-combustible floor assembly
or to wood subflooring attached to sleepers. - ANSWER 1/2"



Ramps used as a part of a means of egress shall have a running

slope Of not steeper than ____. - ANSWER 1:12 horizontally



Ramp landings ____. - ANSWER 60" long



Handrail height between ____. - ANSWER 34"-38"



Round handrails maximum diameter ____. - ANSWER 2"



Handrail should have at least ____ clearance. - ANSWER 1-1/2"



All platforms and mezzanines more than ____ high must have

a ____ guardrail. - ANSWER 30", 42"



Required guards shall not be less than ____ high. - ANSWER 42"



Guardrail balusters shall not allow a sphere greater than ____ in

diameter to pass between them. - ANSWER 4"



Emergency escape and rescue minimum net clear opening of ____. - ANSWER 5.7 s.f.



Maximum height from floor not greater than ____. - ANSWER 44"

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lecchris West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
40
Member since
2 year
Number of followers
15
Documents
3203
Last sold
3 weeks ago
LECCHRIS

3.8

6 reviews

5
2
4
1
3
3
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions