100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

POWER ENGINEERING TECHNOLOGY (PET YR 1): 4B POWER BOILERS EXAM

Rating
-
Sold
-
Pages
36
Grade
A+
Uploaded on
02-11-2024
Written in
2024/2025

POWER ENGINEERING TECHNOLOGY (PET YR 1): 4B POWER BOILERS EXAM

Institution
DC Boiler
Course
DC Boiler











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DC Boiler
Course
DC Boiler

Document information

Uploaded on
November 2, 2024
Number of pages
36
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

POWER ENGINEERING TECHNOLOGY
(PET YR 1): 4A HIGH PRESSURE
BOILERS EXAM


A6characteristic6that6made6early6boilers6very6inefficient6was:
a.6small6heating6surface
b.6an6excess6of6flat6surfaces
c.6the6internal6furnace
d.6lack6of6good6quality6fuels6-6ans--a

A6hot6water6boiler6is6considered6a6high6temperature6water6boiler6when:
a.6it's6design6pressure6is6less6than61100kPa
b.6it's6operating6temperature6is6greater6than61206degrees6celsius6
c.6it's6operating6temperature6is6less6than61206degrees6celsius6
d.6it's6energy6input6exceeds658.7kW6-6ans--b

The6Haycock6boiler6was:
a.6a6watertube6design
b.6a6return6tubular6design
c.6used6around61720
d.6of6welded6construction6-6ans--c

The6steam6space6of6a6boiler6must6be6large6enough6to:
a.6keep6the6steam6pressure6down
b.6reduce6the6cooling6effect6of6water
c.6allow6the6steam6to6rise6from6the6surface6of6the6water
d.6accommodate6all6the6steam6riser6tubes6-6ans--c

The6boiler6term6"drum"6commonly6refers6to6the6pressure6container6of6a6watertube6boiler,6
whereas6the6term6"_______"6commonly6refers6to6the6pressure6vessel6of6a6firetube.
a.6vessel
b.6shell
c.6tank
d.6cylinder6-6ans--b

An6internally6fired6boiler:
a.6is6less6efficient6than6an6externally6fired6unit
b.6utilized6a6high6amount6of6refractory6and/or6firebrick

,c.6has6the6furnace6surrounded6by6water
d.6requires6a6setting6-6ans--c

Packaged6boilers:
a.6are6shipped6in6a6packing6case6with6the6components6disassembled
b.6are6completely6factory-built
c.6must6not6be6used6over6100kPa6working6pressure
d.6have6risers6and6downcomers6-6ans--b

In6a6bottom-supported6boilers,6the6steam6drum6is6usually:
a.6supported6by6an6overhead6girder6arrangement6
b.6supported6by6the6water6tubes
c.6supported6by6the6piers
d.6placed6between6the6centre6line6of6the6unit6-6ans--b

When6part6of6firetube6boilers,6heads6are6commonly6called6what?
a.6heads
b.6tube6sheets
c.6plates
d.6end6plates6-6ans--b

Boiler6manholes6are6openings6through6which6a6person6can:
a.6enter6the6boiler6furnace
b.6inspect6the6boiler6uptake
c.6inspect,6maintain6or6repair6internal6parts6of6a6boiler
d.6enter6and6inspect6the6steam6header6-6ans--c

Handhold6and6manhole6openings:
a.6permit6inspection,6cleaning6and6repairs
b.6require6a6cast6iron6reinforcing6ring
c.6are6not6required6on6low6pressure6hot6water6boilers
d.6are6required6on6high6pressure6boilers6only6-6ans--a

A6force6that6holds6the6manway6doors6of6the6boiler6drums6in6place6during6operation6is6the:
a.6bolting6force
b.6force6on6the6yoke
c.6boiler6pressure
d.6strength6of6the6welds6-6ans--c

Beading6the6tube6ends6in6a6firetube6boiler:
a.6stops6tube6leakage
b.6eliminates6the6need6to6expand6the6tubes6into6the6tube6sheet
c.6helps6prevent6overheating6of6the6tube6ends
d.6must6be6followed6by6seal6welding6-6ans--c

Firetube6boilers6have6their6tubes6fixed6into6flat6steel6plates6known6as:

,a.6shells
b.6drums
c.6headers
d.6tube6sheets6-6ans--d

Manholes6are:
a.6installed6on6all6boilers
b.6provides6for6inspection6purposes
c.6always6circular6in6shape
d.6installed6on6fossil6fired6boilers6only6-6ans--b

A6_______6is6a6water6filled6section,6which6surrounds6the6firebox6in6a6locomotive6boiler.
a.6Crown6sheet
b.6boiler6drum
c.6steam6done
d.6water6leg6-6ans--d

A6firetube6boiler6is6one6that6has:
a.6water6on6the6inside6of6the6tubes6and6hot6gas6on6the6outside
b.6the6furnace6as6the6first6pass6of6the6burner6flame
c.6water6on6the6outside6of6the6tubes6and6hot6water6on6the6inside6of6the6tubes6
d.6water6on6the6outside6of6the6tubes6and6hot6gas6on6the6inside6of6the6tubes6-6ans--d

A6water6leg6is6found6on6a/an6_______6boiler.
a.6scotch
b.6watertube
c.6locomotive
d.6HRT6-6ans--c

When6the6hot6combustion6gases6travel6through6boiler6tubes6which6are6surrounded6by6bo
iler6water6in6the6boiler6is6called6a:
a.6watertube6boiler
b.6tubular6boiler
c.6coil6type6boiler6
d.6firetube6boiler6-6ans--d

With6regard6to6a6steam6boiler,6the6lettering6"HRT"6means:6
a.6highly6regulated6temperature
b.6hot6return6tubes
c.6horizontal6return6tubular
d.6horizontal6receiver6tubes6-6ans--c

An6advantage6of6a6vertical6tubeless6firetube6boiler6is6that6it6requires:
a.6relatively6small6floor6space
b.6no6fuel6handling6equipment
c.6less6fuel6for6combustion

, d.6very6little6water6treatment6-6ans--a

The6passage6of6combustion6gases6along6the6length6of6the6boiler6is6referred6to6as6a:
a.6stack6pass
b.6combustion6gas6pass
c.6combustion6air6pass
d.6chimney6pass6-6ans--b

A6corrugated6furnace6will6give6required6strength6with6thinner6metal,6increases6heating6su
rface,6and:
a.6increase6the6boiler6mass
b.6add6to6the6overall6material6cost6of6the6unit
c.6decrease6combustion6turbulence
d.6allow6for6differential6expansion6and6contraction6-6ans--d

Corrugated6furnaces:
a.6permit6expansion6and6contraction6with6reduced6stress
b.6are6cheaper6than6plain6furnaces
c.6are6made6from6rolled6copper
d.6require6fewer6stays6than6plain6furnaces6-6ans--a

Boiler6stays:
a.6are6used6to6support6flat6surfaces6in6a6boiler
b.6are6mostly6used6in6watertube6boilers
c.6have6to6be6replaced6every626years
d.6secure6a6boiler6to6its6foundation6-6ans--a

A6watertube6boiler6is6a6boiler6in6which:
a.6water6passes6through6the6tubes
b.6air6passes6through6the6tubes
c.6water6passes6around6the6tubes
d.6combustion6gases6pass6through6the6tubes6-6ans--a

Bent6tube6watertube6boilers:
a.6cannot6have6the6furnace6water-lined
b.6furnaces6are6lined6with6water6tubes6to6absorb6more6radiant6head6from6the6fire
c.6are6externally6fired
d.6cannot6be6fitted6with6heat6recovery6components6-6ans--b

A6cyclone6separator6in6a6boiler6steam6drum:
a.6removes6moisture6from6steam,6using6centrifugal6force
b.6causes6impurities6to6be6thrown6from6the6boiler6water
c.6is6located6at6the6superheater6outlet
d.6discharged6water6into6the6scrubbers6-6ans--a

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
favouredone Havard university
View profile
Follow You need to be logged in order to follow users or courses
Sold
325
Member since
1 year
Number of followers
32
Documents
8842
Last sold
1 week ago
favoredone

Welcome to favoredone ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

4.4

340 reviews

5
222
4
74
3
24
2
3
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions