Construction Math Trade
Terms Quiz- NCCER
Introduction to Construction
Math Test
ten thousands - ✔✔✔ANSWER-What is the place value of 7 in the number
576,312?
36,211 - ✔✔✔ANSWER-Thirty-six thousands, two hundred eleven pipe fittings
have been ordered how would you write this in a whole number using digits?
1,235 - ✔✔✔ANSWER-Add the following numbers together 413, 718, 94, and 10.
The sum is
$1,050.00 - ✔✔✔ANSWER-You receive $30.00 an hour as a pipe fitters working
40 hours a week. The taxes withheld from your paycheck are $110.00 federal tax
and $40.00 state tax. How much is your net check amount?
, 320 - ✔✔✔ANSWER-You receive a package with 16 bolts and the package must
be delivered to 20 job sites. How many bolts do you have in total to distribute?
215 - ✔✔✔ANSWER-You have 6,020 meters of rope that have to cut into 28
meter sections. How many sections of 28 meters will you have?
18/54 - ✔✔✔ANSWER-The equivalent fraction to 6/18 is
1/3 - ✔✔✔ANSWER-When 4/12 is reduced to the lowest terms what is the answer
6 1/6 - ✔✔✔ANSWER-9.37/6 is an improper fraction that can be changed to what
mixed number
5/8 - ✔✔✔ANSWER-Reduce your answer to the lowest term. 1/4 + 3/8
1/6 - ✔✔✔ANSWER-Reduce your answer to the lowest term. 8/12-4/8=
5/12 - ✔✔✔ANSWER-Reduce your answer to the lowest term. 4/8 X 5/63=
2 - ✔✔✔ANSWER-Reduce your answer to the lowest term. Divide 7/8 by 7/16
that part of the number is less than 1 - ✔✔✔ANSWER-In a number such as 64.35,
any numbers shown to the right of the decimal point represent
0.5233 - ✔✔✔ANSWER-In the series of numbers, which is the higher number?
0.05243, 0.05233, 0.5233, 0.5143.