QSP/QSD Questions And Well Elaborated Solutions Records are required to remain onsite during the construction period for a minimum of ___ - answer -3 Years When does Risk Level 1 site have to sample? - answer -When required for nonvisible pollutants When would receiving water monitoring occur? - answer -Effluent that exceeds the receiving water monitoring triggers contained in the GP and with direct discharges to receiving water When would bioassessment sampling take place? - answer -RISK level 3 and LUP Type 3 Sites larger than 30 acres and with direct discharges to receiving waters. (before and after sire completion) Where do records need to be available? - answer -At the construction site until construction is complete. LUPs may be retained in a crew members vehicle and made available upon request ATS - answer -Active Treatment Systems What do ATS do? - answer -Add chemicals to facilitate flocculation, coagulation and filtration of suspended sediment particles. Measured by NELs When does risk level 1 site have to sample - answer -When required for nonvisible pollutants Which construction activity is not covered under the CGP - answer -Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility When is the primary federal law governing storm water pollution and regulation? - answer -Clean Water Act The LRP's (Legally Responsible Person) approved signatory must be: - answer - Corporation - A responsible corporate officer Partnership/sole proprietorship - general partner/proprietor Municipality/State/federal/public agency Military During a routine inspection a LUP discharger observes a non-storm water discharge and therefore must prepare a non-storm water report - answer -? if required, when should Risk Level 1 sites conduct discharge sampling - answer - During business hours What 4 distinct phases of construction activities does the General Permit Recognize - answer -Grading and Land Development Streets and Utilities Vertical Construction Final Landscaping and site Stabilization Any construction or demolition activity, including, but not limited to, clearing, grading, grubbing, or excavation, or any other activity that results in a land DISTURBANCE of equal to or greater than ___ acre - answer -1 LUPs - answer -Linear Underground/Overhead Utility Projects What is the primary federal law governing storm water pollution and regulation - answer -Clean Water Act The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the ____ may also serve as the LRP - answer -LUP Visual Monitoring is required for... - answer -All sites subject to this General Permit Regional Water boards are responsible for____ - answer -Implementation and enforcement of the General Permit. Have some flexibility and authority to alter, approve, exempt, or rescind permit. LRP - answer -Legally Responsible Person What does the LRP do? - answer -Obtain coverage by electrinically filing Permit Registration Documents (PRDs) prior to construction PDRs Consist of - answer -Notice of Intent (NOI) Risk Assessment Site Map SWPPP Annual Fee Signed Certification Statement Small Construction Rainfall Erosivity Waiver - answer -Applies to sites between 1 - 5 acres demonstrating that thee are not adverse water quality impacts Discharges eligible for Rainfall Erosivity Waiver must take place during a period when the value is the rainfall erosivity factor is less than___ - answer -5 If the new R factor is 5 or above - answer -The LRP shall be required to apply for coverage under this order. The discharger may reduce or increase the total acreage covered under the GP when... - answer -A portion of the site is complete and/or conditions for termination have been met (when ownership of a portion of the site is sold to different entity or when new acreage is added to the site) Revisions to add/reduce disturbed acreage must be filed electronically within ____ - answer -30 Days

Show more Read less
Institution
QSP/QSD
Course
QSP/QSD









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
QSP/QSD
Course
QSP/QSD

Document information

Uploaded on
November 1, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

QSP/QSD Questions And Well Elaborated
Solutions

Records are required to remain onsite during the construction period for a
minimum of ___ - answer -3 Years

When does Risk Level 1 site have to sample? - answer -When required for non-
visible pollutants

When would receiving water monitoring occur? - answer -Effluent that exceeds
the receiving water monitoring triggers contained in the GP and with direct
discharges to receiving water

When would bioassessment sampling take place? - answer -RISK level 3 and LUP
Type 3 Sites larger than 30 acres and with direct discharges to receiving waters.
(before and after sire completion)

Where do records need to be available? - answer -At the construction site until
construction is complete. LUPs may be retained in a crew members vehicle and
made available upon request

ATS - answer -Active Treatment Systems

What do ATS do? - answer -Add chemicals to facilitate flocculation, coagulation
and filtration of suspended sediment particles. Measured by NELs

When does risk level 1 site have to sample - answer -When required for non-
visible pollutants

Which construction activity is not covered under the CGP - answer -Routine
maintenance to maintain original line and grade, hydraulic capacity, or original
purpose of the facility

, When is the primary federal law governing storm water pollution and regulation? -
answer -Clean Water Act

The LRP's (Legally Responsible Person) approved signatory must be: - answer -
Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military

During a routine inspection a LUP discharger observes a non-storm water
discharge and therefore must prepare a non-storm water report - answer -?

if required, when should Risk Level 1 sites conduct discharge sampling - answer -
During business hours

What 4 distinct phases of construction activities does the General Permit
Recognize - answer -Grading and Land Development
Streets and Utilities
Vertical Construction
Final Landscaping and site Stabilization

Any construction or demolition activity, including, but not limited to, clearing,
grading, grubbing, or excavation, or any other activity that results in a land
DISTURBANCE of equal to or greater than ___ acre - answer -1

LUPs - answer -Linear Underground/Overhead Utility Projects

What is the primary federal law governing storm water pollution and regulation -
answer -Clean Water Act

The person in charge of the utility company, municipality, or other public or
private company or agency that owns or operates the ____ may also serve as the
LRP - answer -LUP

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
121
Member since
1 year
Number of followers
5
Documents
3167
Last sold
1 week ago
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3.8

13 reviews

5
7
4
2
3
1
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions