Solutions
Records are required to remain onsite during the construction period for a
minimum of ___ - answer -3 Years
When does Risk Level 1 site have to sample? - answer -When required for non-
visible pollutants
When would receiving water monitoring occur? - answer -Effluent that exceeds
the receiving water monitoring triggers contained in the GP and with direct
discharges to receiving water
When would bioassessment sampling take place? - answer -RISK level 3 and LUP
Type 3 Sites larger than 30 acres and with direct discharges to receiving waters.
(before and after sire completion)
Where do records need to be available? - answer -At the construction site until
construction is complete. LUPs may be retained in a crew members vehicle and
made available upon request
ATS - answer -Active Treatment Systems
What do ATS do? - answer -Add chemicals to facilitate flocculation, coagulation
and filtration of suspended sediment particles. Measured by NELs
When does risk level 1 site have to sample - answer -When required for non-
visible pollutants
Which construction activity is not covered under the CGP - answer -Routine
maintenance to maintain original line and grade, hydraulic capacity, or original
purpose of the facility
, When is the primary federal law governing storm water pollution and regulation? -
answer -Clean Water Act
The LRP's (Legally Responsible Person) approved signatory must be: - answer -
Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military
During a routine inspection a LUP discharger observes a non-storm water
discharge and therefore must prepare a non-storm water report - answer -?
if required, when should Risk Level 1 sites conduct discharge sampling - answer -
During business hours
What 4 distinct phases of construction activities does the General Permit
Recognize - answer -Grading and Land Development
Streets and Utilities
Vertical Construction
Final Landscaping and site Stabilization
Any construction or demolition activity, including, but not limited to, clearing,
grading, grubbing, or excavation, or any other activity that results in a land
DISTURBANCE of equal to or greater than ___ acre - answer -1
LUPs - answer -Linear Underground/Overhead Utility Projects
What is the primary federal law governing storm water pollution and regulation -
answer -Clean Water Act
The person in charge of the utility company, municipality, or other public or
private company or agency that owns or operates the ____ may also serve as the
LRP - answer -LUP