ICC Bolting/ 146 Questions with Definitive Solutions/ . Terms like: According to the IBC, the "blank" is to hire the special inspector. - Answer: owner or owners’ agent. 2009 IBC Section 1704.1 According to the IBC, the "blank" is the responsible for the approval of a person's qualifications to act as a special inspector. - Answer: code official. 2009 IBC, Section 1704.1 According to the IBC, discrepancy corrections are made known to the building official by: - Answer: final report. 2009 IBC, Section1704.1.2 When is the code official to be made aware of a discrepancy found during a special inspection? - Answer: If it is not corrected by the contractor. 2009 IBC, Section 1704.1.2 According to the Model Program for Special Inspection, the special inspector is to document work that is nonconforming: - Answer: In a written report - Section II B 4 - Model Programs According to the Model Program for Special Inspection, the special inspector is to prepare written report of inspection: - Answer: After each inspection visit - Section II B 5 - Model Programs

Show more Read less
Institution
ICC Bolting
Course
ICC Bolting










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC Bolting
Course
ICC Bolting

Document information

Uploaded on
October 31, 2024
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC Bolting/ 146 Questions with Definitive Solutions/
2024-2025.
According to the IBC, the "blank" is to hire the special inspector. - Answer: owner or owners’
agent. 2009 IBC Section 1704.1


According to the IBC, the "blank" is the responsible for the approval of a person's qualifications
to act as a special inspector. - Answer: code official. 2009 IBC, Section 1704.1


According to the IBC, discrepancy corrections are made known to the building official by: -
Answer: final report. 2009 IBC, Section1704.1.2


When is the code official to be made aware of a discrepancy found during a special inspection? -
Answer: If it is not corrected by the contractor. 2009 IBC, Section 1704.1.2


According to the Model Program for Special Inspection, the special inspector is to document
work that is nonconforming: - Answer: In a written report - Section II B 4 - Model Programs


Page 1 of 19

,According to the Model Program for Special Inspection, the special inspector is to prepare
written report of inspection: - Answer: After each inspection visit - Section II B 5 - Model
Programs


According to the Model Program for Special Inspection, which of the following items does not
need to be included in each inspection report? - Answer: Description of discussions with the
contractor - Section B 5 - Model Programs


According to the Specification for Structural Joints using high strength bolts, the nominal
diameter of standard bolt holes shall be how much larger than the nominal bolt diameter? -
Answer: 1/16 inch - Specification for Structural Joints Table 3.1


Discrepancies in the work shall be brought to the immediate attention of the "blank" for
corrective action. - Answer: the contractor - 2009 IBC, Section 1704.1.2.


The special inspector shall furnish inspection reports to the "blank" and to the "blank"? -
Answer: Building Official and Registered Design professional


The special inspector shall provide continuos inspection of: - Answer: Single-pass fillet welds
greater than 5/16 inch in size - 2099 IBC, Table 1704.3, Item 5.3


The special inspections required by this code are not required where the work is done on the
premise of a? - Answer: Approved fabricator - 2009 IBC, Section 1704.2.2


The special inspection of the steel fabrication process shall not be required where the fabricator
does not perform any? - Answer: heating operations - 2009 IBC, Section 1704.3, Exceptions # 1




Page 2 of 19

, According to the Specifications for Structural Steel Buildings, ASTM Standard "blank" is to be
used for the material test for steel sheets. - Answer: A568 - Section A31, Specifications for
Structural Steel Buildings


According to the Specifications for Structural Steel Buildings, the "blank" conducts the material
tests for identification of the structural steel. - Answer: Fabricator or Testing Laboratory -
Section A31, Specifications for Structural Steel Buildings.


According to the Specifications for Structural Steel Buildings, which of the following steel
members are allowed to be unidentified steel? - Answer: Unimportant members, where their
physical properties and weldability would not affect the structure strength - Section A31b,
Specifications for Structural Steel Buildings


According to the Code of Standard Practice for Steel Buildings and Bridges, how is steel of
special material to be identified? - Answer: It is marked by the supplier - Section 5.1.1, Code of
Standard Practice for Steel Buildings and Bridges


According to the Code of Standard Practice for Steel Buildings and Bridges, how are fabricators
stock steel material identified? - Answer: Certified mill test reports - Section 5.2.2 - Code of
Standard Practice for Steel Buildings and Bridges


According to the Specification for Structural Steel Buildings, what ASTM Standard would apply
to a sample for structural steel pipe? - Answer: A53 - Section A31a - Specification for Structural
Steel Buildings


According to the Code of Standard Practice for Steel Buildings and Bridges, the number of
samples required to be tested for structural steel is: - Answer: The number specified by the
ASTM specification - Section 5.1.1 - Code of Standard Practice for Steel Buildings and Bridges




Page 3 of 19

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Pronurse1 Alabama State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
2524
Member since
2 year
Number of followers
64
Documents
3437
Last sold
2 days ago
passionate tutor

I am passionate and reliable in my work as a tutor, for all your assignments and questions on Various subjects, please don't hesitate to reach out to me. May you Prosper in your field of studies.

4.2

599 reviews

5
312
4
164
3
89
2
23
1
11

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions