100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NCCCO TEST Questions With Top-Quality Answers

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
25-10-2024
Written in
2024/2025

1) According to ASME, when rails are used for the crane support, the rails splices mus: - ANSWER-A) be smooth 2) What is the task of high-tensile bolt connections between tower sections? - ANSWER-A) To avoid fail. 3) According to the Tower Crane Reference Manual, how often should the hoist wire rope be lubricated? - ANSWER-A) Every 200 hours of operation. 4) According to the Tower Crane Reference Manual, which operation Does Not risk the stability of the crane? - ANSWER-A) Decrease the load after have lifted it. 5) Before and after the climbing of a tower crane, how do you plumb the tower? - ANSWER-A) when the tower is balanced. 6) According to sheet C, where does the climbing unit have to be located with 12 tower sections added and the guided section removed? - ANSWER-A) On the undercarriage. 7) How much does a cubic foot of steel weights? - ANSWER-A) 490 LBS. 8) What's the purpose of the twist compensator? - ANSWER-A) To avoid twisted hook block.

Show more Read less
Institution
Nccco
Course
Nccco








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nccco
Course
Nccco

Document information

Uploaded on
October 25, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCCO TEST Questions With Top-
Quality Answers
1) According to ASME, when rails are used for the crane support, the rails splices mus:
- ANSWER-A) be smooth



2) What is the task of high-tensile bolt connections between tower sections? -
ANSWER-A) To avoid fail.



3) According to the Tower Crane Reference Manual, how often should the hoist wire
rope be lubricated? - ANSWER-A) Every 200 hours of operation.



4) According to the Tower Crane Reference Manual, which operation Does Not risk the

stability of the crane? - ANSWER-A) Decrease the load after have lifted it.



5) Before and after the climbing of a tower crane, how do you plumb the tower? -
ANSWER-A) when the tower is balanced.



6) According to sheet C, where does the climbing unit have to be located with 12 tower

sections added and the guided section removed? - ANSWER-A) On the undercarriage.



7) How much does a cubic foot of steel weights? - ANSWER-A) 490 LBS.



8) What's the purpose of the twist compensator? - ANSWER-A) To avoid twisted hook
block.



9) According to OSHA, when erecting or dismantling self erecting tower cranes,
$10.19
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Vaster
5.0
(2)

Also available in package deal

Thumbnail
Package deal
NCCCO EXAM BUNDLE QUESTIONS WITH 100% COMPLETE SOLUTIONS
-
25 2024
$ 271.45 More info

Get to know the seller

Seller avatar
Vaster Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
1 year
Number of followers
1
Documents
794
Last sold
1 month ago

5.0

2 reviews

5
2
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions