100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

QSP/QSD Questions and Answers 2024

Rating
-
Sold
1
Pages
9
Grade
A+
Uploaded on
23-10-2024
Written in
2024/2025

QSP/QSD Questions and Answers 2024

Institution
QSP/QSD
Course
QSP/QSD









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
QSP/QSD
Course
QSP/QSD

Document information

Uploaded on
October 23, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

QSP/QSD Questions and Answers 2024
A Compliance Strom Exemption may be available for what would otherwise be a -
ANSWER-NEL violation or RWMT

A discharger is considered covered by the CGP when____ - ANSWER-Once they have
recieed a WDID number sent by SMARTS

A NOT may be requested under the following conditions except: - ANSWER-All
disturbed lands have been stabilized and material storage areas have secondary
containment

All linear project SWPPPs must be developed to - ANSWER-include Narrative BMPs
which may or may not be drawn on a BMP map

All PDRs must be certified by _____ - ANSWER-The LRP or legally authorized
approved signatory

All projects are subject to monitoring for which parameters - ANSWER-Non-visible
pollutants

All projects are subject to which type of monitoring - ANSWER-Visual monitoring

All risk level discharges shall ensure that sire inspection reports include the following
weather information - ANSWER-Presence or absence of rain
Est beginning of storm event, duration, and time since last event
approx amount of rainfall in inches

Amendments to the SWPPP are the responsibility of the - ANSWER-QSD

Annual reports are due each year by - ANSWER-September 1st

Annual reports must contain all except - ANSWER-Inspection photographs from LUP
projects

Any construction or demolition activity, including, but not limited to, clearing, grading,
grubbing, or excavation, or any other activity that results in a land DISTURBANCE of
equal to or greater than ___ acre - ANSWER-1

Any person who violates any permit condition of the GP is subject to a civil penalty not
to exceed $____ - ANSWER-$37,500 per calendar year of such violation

Are LUP projects subject to the post-construction standards in the CGP? - ANSWER-
Yes

, Are sediment control BMPs a primary or secondary means of preventing storm water
contamination? - ANSWER-Secondary

ATS - ANSWER-Active Treatment Systems

ATS instrumentation shall record which of the following? - ANSWER-Flow, Turbidity,
and pH

ATS monitoring always included all of the following except - ANSWER-SSC

Authorized non-storm water discharges may include those from____ - ANSWER-
Dechlorinated potable water sources such as:
Fire Hydrant Flushing, Irrigation of Veg Erosion Control Measures, Pipe
Flushing/Testing, Dust Control, Uncontaminated ground water from dewatering

Bioassessment exemptions may be allowed for projects in ecoregions with an index
period that is - ANSWER-Outside of construction commencement

Bioassessment monitoring is an assessment of - ANSWER-Measure of the number and
diversity of benthic macroinvertebrates in a water body

Bioassessment protocols used on Level 3 projects must follow those found in -
ANSWER-SWAMP

Cable installation projects of more than 30 acres disturbed in project area or section
designated as type 3 and directly discharging into receiving waters are subject to which
following form of stormwater monitoring? - ANSWER-Bioassessment

CASQA Stands for - ANSWER-California Stormwater Quality Association

Conditions for Termination of Coverage - ANSWER-Within 90 Days when construction
is complete or ownership transferred File through SMARTS
1. File NOT
2. Final Site Map
3. Photos

Construction General Permit order DWQ-2009-0009 regulates storm water discharges
from? - ANSWER-All linear utility projects and construction sites that disturb over 1 acre

Continuous monitoring (no less than 15-minute intervals) of ATS is required for -
ANSWER-Flow and Turbidity

CSMP and M&RP relate respectively to - ANSWER-Traditional and LUP projects

CSMP stands for - ANSWER-Construction Site Monitoring Program

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CLOUND Exam
View profile
Follow You need to be logged in order to follow users or courses
Sold
602
Member since
2 year
Number of followers
389
Documents
10889
Last sold
3 days ago
PROF MM

HELLO WELCOME TO THIS PAGE WHERE YOU WILL FIND ALL EXAMS ,STUDY GUIDE ,CASE, TESTBANKS AND ANY OTHER STUDY MATERIALS,

3.9

116 reviews

5
58
4
16
3
29
2
3
1
10

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions