100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

COSC 153 GUY COOKE EXAM 2 CORRECT 100%

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
17-10-2024
Written in
2024/2025

Name the four fundamental stages of the construction management process after the design stage. - ANSWER Pre construction, procurement, construction and post construction What are the five distinct stages of the design process? - ANSWER programming, feasibility, schematic design, design development and contract documents How does the quality of the design drawings impact the quality of construction? - ANSWER poor drawings=poor construction, vice versa

Show more Read less
Institution
COSC 153
Course
COSC 153

Content preview

COSC 153 GUY COOKE EXAM 2 CORRECT
100%
Name the four fundamental stages of the construction management process after the design stage. -
ANSWER Pre construction, procurement, construction and post construction



What are the five distinct stages of the design process? - ANSWER programming, feasibility, schematic
design, design development and contract documents



How does the quality of the design drawings impact the quality of construction? - ANSWER poor
drawings=poor construction, vice versa



In relation to construction, what is meant by the term due diligence? - ANSWER to ensure the property is
suitable for its intended purpose and mitigate any risks that could potentially arise during development.
Occurs during the preconstruction phase.



What are the two procurement instruments used to buy out the construction job? - ANSWER
subcontractors and purchase orders



Name at least three positions that make up the members of the onsite construction management team.
- ANSWER superintendent, assistant superintendent, field engineer.



What occurrence marks the official end of the project? - ANSWER the architect releases a certificate of
substantial completion



What is the name of the tool used to keep track of and manage completion of all the loose ends, minor
repairs, adjustments, and missing items at the end of a project? - ANSWER a punch list



What is value engineering and what is its purpose? - ANSWER to simplify products and processes

, Why is it important to have a clear distinction between the project punchout and the warranty period? -
ANSWER the completion of a punchout and warranty implies substantial completion of the project. If
work items continue to be added to the punch list a project will never end.



Name three key members of the project team. - ANSWER owner, principle design firm, and the general
contractor.




How does the low bid mentality challenge the ability for the (AEC) industry to make cultural shifts -
ANSWER when low price drives the project delivery process, there is no room for any real value
generation or innovative solution finding to optimize our clients return on investment.



What is the basic differences between management and leadership - ANSWER management is the ability
to control a group, leadership is to influence and motivate



What is a construction estimate? - ANSWER used to forecast how much it will cost to build the structure
in your project plan



Name the four primary categories of costs in the construction estimate - ANSWER materials, labor,
equipment, subcontracts



How are construction estimates typically organized? - ANSWER CSI Masterformat



What type of estimate would we probably do if we were meeting with a client for the first time and they
wanted to get a rough idea about their project cost? - ANSWER rough order of magnitude, (ROM)
estimate



Identify the four preparation steps taken to start the estimating process. - ANSWER review the plans and
specs, develop a query list, attend the pre-bid meeting, and to visit the site



What are general conditions? - ANSWER services, equipment, and materials that general contractors
provide to ensure that projects are completed as drawn and specified within the projects schedule

Written for

Institution
COSC 153
Course
COSC 153

Document information

Uploaded on
October 17, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • cosc 153

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
616
Member since
3 year
Number of followers
369
Documents
18022
Last sold
5 hours ago
GOLD PREMIUM

HELLO? welcome to my store thanks for visiting this page here you are guaranteed of well revised and assured EXAMS ALL GRADED A+ thus making your education journey easy and seamless . DO NOT HESITATE TO CONTACT ME IF YOU ARE IN NEED OF ANY EXAM .I AM READY 24/7 TO ASSIST YOU ALSO REFER YOUR FRIENDS.

4.1

116 reviews

5
69
4
10
3
23
2
2
1
12

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions