100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

COSC 153 Part 2 Complete Questions & solutions(RATED A)

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
17-10-2024
Written in
2024/2025

What are the 4 design stages? - ANSWER Programming Stage, Schematic Design, Design Development, Construction Documents Programing Stage - ANSWER Written statement of the requirements that identify important information. Happens prior to start Schematic Design - ANSWER Create a basic design identifying shape and size of spaces, as well as alternatives, types of product, and more involvement from designer

Show more Read less
Institution
COSC 153
Course
COSC 153

Content preview

COSC 153 Part 2 Complete Questions &
solutions(RATED A)
What are the 4 design stages? - ANSWER Programming Stage, Schematic Design, Design Development,
Construction Documents



Programing Stage - ANSWER Written statement of the requirements that identify important information.
Happens prior to start



Schematic Design - ANSWER Create a basic design identifying shape and size of spaces, as well as
alternatives, types of product, and more involvement from designer



Design Development - ANSWER Development of a design with much more detail, and development of
specs. Good drawings are developed. Contractor involved



Construction Documents - ANSWER Complete set of drawings and specs that provide comprehensive
info. This will be what we will build off of



Value Engineering - ANSWER Substituting one product for another for a lower price, but retaining quality.
Can only be done during design phase



As Build - ANSWER Whatever is built that was not on the original drawings



Building code compliance - ANSWER Contractors have more responsibility in residential, designer has
more responsibility in commercial



Pre-Construction Phase - ANSWER Varies based on type of contract signed. Anticipate problems before
they become actual problems

, Procurement phase - ANSWER Project "buy out" phase. Purchasing all the work, labor, materials, tools,
and equipment



In construction, everything is about - ANSWER Relationships



Key role of the owners team? - ANSWER The goal is to make this team look as good as possible



Key players of the city/county teams? - ANSWER Inspectors are an essential player of this team



Why is it important to establish relationships with partners? - ANSWER You can build trust with partners
and identify shared values. this makes working more effective. MUST BE INTENTIONALLY DONE



Management vs leadership - ANSWER Managers manage things (programs, budgets, schedules, quality
plans); Leaders lead people (teams, subcontractors, designers, owners).



Management involves: - ANSWER Planning, organization, controlling



Leadership involves: - ANSWER Setting direction, aligning, motivating. Leadership is not about status and
ranks, its about taking seniority



Respect - ANSWER Respect is fundamental to creating high performance teams. Collaboration becomes
easier



Reputation/ Ethic - ANSWER Reputation is everything, and is something we have a fair amount of control
in managing. Good character is the key to having good reputation



Preconstruction services - ANSWER Services provided by the contractor to help flesh out additional
information related to project challenges.



When do preconstruction services occur? - ANSWER Occur prior to the start of construction. Usually
happen during the design phase of a CMAR or Design-build project.

Written for

Institution
COSC 153
Course
COSC 153

Document information

Uploaded on
October 17, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • cosc 153

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
616
Member since
3 year
Number of followers
369
Documents
18022
Last sold
5 hours ago
GOLD PREMIUM

HELLO? welcome to my store thanks for visiting this page here you are guaranteed of well revised and assured EXAMS ALL GRADED A+ thus making your education journey easy and seamless . DO NOT HESITATE TO CONTACT ME IF YOU ARE IN NEED OF ANY EXAM .I AM READY 24/7 TO ASSIST YOU ALSO REFER YOUR FRIENDS.

4.1

116 reviews

5
69
4
10
3
23
2
2
1
12

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions