The law that set into place stormwater regulations in the 1970s is - ANSWER The Clean
Water Act
Regulations for managing stormwater activity on a construction site are outlined in the -
ANSWER NPDES
When should you read and understand your project stormwater pollution prevention
plan - ANSWER Immediately after the project awarded and before you begin any site
work is
Which of the following is not an allowable stormwater discharge or non-stormwater
discharge - ANSWER Discharges are contaminated groundwater
Construction activity may begin - ANSWER When the jurisdiction of operation specifies
you can start
Waters that sell anti-degration standards are placed on the _______ list - ANSWER
303D
SWPP certifications are signed by - ANSWER An officer of the project owner or an
officer of the general contractor.
TRUE OR FALSE: The document that must be completed signed and submitted to the
state to obtain authorization to discharge is the NOT - ANSWER False
The notice of termination can be filed when - ANSWER All construction inside and
outside of the building is completed and the final stabilization has been verified as
complete
Operators on a construction site are the entity in charge of plans and specifications and
the entity who is - ANSWER Is in charge of daily activities
You should have a SWPPP for your construction site because (3 reasons) - ANSWER
1. Its documents stormwater management
2. Demonstrates your intent to manage stormwater on your site