100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM Exam Review 2 Questions And 100% Correct Answers

Rating
-
Sold
-
Pages
38
Grade
A+
Uploaded on
13-10-2024
Written in
2024/2025

PJM Exam Review 2 Questions And 100% Correct Answers...

Institution
PJM
Course
PJM











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
October 13, 2024
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Exam Review 2 Questions And 100%
Correct Answers

EOP-005-2

NERC Requirements for Critical Black Start



Each GOP with a Blackstart Resource shall notify its TOP of any Real Time changes to
the capabilities of that Blackstart Resources affecting its ability to meet the TOPs
restoration plan within _________ following such change.

24 hours

Minimum Generation Alert is implemented when the expected generation level is within
____ of normal minimum energy limits

2,500 MW



Manual Load Dump

Capacity deficient zone sheds load. If zones are deficient, load shed is proportionally
based on level of shortage.



NERC Energy Emergency Alerts (EEA)

Alerts issued by Reliability Coordinator (RC) to ensure that all RCs understand potential
and actual energy emergencies.



EEA Level 1 (All Available Resources in Use)

Control Area foresees or is experiencing conditions where all available resources are
committed



When does PJM issue an EEA Level 1?

,Maximum Generation Emergency Alert




EEA Level 2 (Load Management Procedures in Effect)

Control Area foresees or has implemented procedures up to but excluding interruption
of firm load commitments



Under What Circumstances Does PJM Declare an EEA Level 2?

Emergency Mandatory Load Management Reductions Action, a Voltage Reduction
Action, or a Deploy All Resources Action (whichever issued first)



EEA Level 3 (Firm Load Interruption Imminent or In Progress)

Control Area foresees or has implemented firm load obligation interruption




When does PJM declare an EEA Level 3?

Manual Load Dump Action



BES

Bulk Electric System



Possible Triggers for Conservative Operations:

Fuel Delivery Issues

Forrest or Brush Fires

Environmental Alerts

Bad Weather

Geomagnetic Disturbances (GMD)

Terrorist or Sabotage threats against the BES

,PJM entering as NERC defines it an "Unknown Operating State"



What are PJMs most important limits?

Interconnection Reliability Operating Limits (IROLs)



PJM Actions during Conservative Operations

Begin additional off-cost operations

Purchase additional reserves

- Can consider a number of contingencies being lost

- Additional security on communications

- Request additional system status reports

- Request members to staff backup centers, critical BES substations, black start
facilities



Member Actions for Conservative Operations:

- Provide additional reporting data

- Staff substations or generating plants

- Comply with PJM operational instructions or dispatch signals



Gas utilities prioritize ____________ during cold weather

heating over electricity generation



RTO Natural Gas Coordination Procedure:

NYISO, ISO-NE, and PJM joint effort to communicate with Gas Suppliers of Interstate
Gas pipelines to manage any potential inadequacy situations.

Data reported within the RTO Natural Gas Coordination Procedure

Interconnection points

Deals of gas supply & transmission

, Gas line maps

Interstate pipeline supplier

Location of units

Supplier list

PJM Actions during Fuel Delivery Emergencies

Weather Watch

Examine and predict gas requirement

ISO Conference calls

Acquire more data from pipelines

Strategy Development

Execute Conservation Operations

**

Member Activities for Fuel Delivery Emergency Events

Provide ancillary information

Notify PJM of gas delivery supply limitations

Comply with operating instructions

***

What fuel type is impacted when OFOs are called?

Natural Gas

***

NOAA

National Oceanic and Atmosphere Administration

***

If NOAA forecasts a geo-magnetic storm potentially at __________ or greater severity,
PJM will notify all market participants through the All-Call system and the Emergency
Procedure Posting Application

K7

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Easton West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
501
Member since
2 year
Number of followers
221
Documents
21802
Last sold
3 days ago

3.9

111 reviews

5
53
4
21
3
21
2
7
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions