100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM Exam Questions And Verified Detailed Answers Latest Update

Rating
-
Sold
-
Pages
47
Grade
A+
Uploaded on
13-10-2024
Written in
2024/2025

PJM Exam Questions And Verified Detailed Answers Latest Update...

Institution
PJM
Course
PJM











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
October 13, 2024
Number of pages
47
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • pjm
  • pjm exam

Content preview

PJM Exam Questions And Verified Detailed Answers
Latest Update


What software tool is designed to enable the PJM dispatchers to manage generating
unit and transmission constraint information and administer the Real-Time Regulation
Market? - ANSWER Dispatch Management Tool (DMT)



What system would resolve a backup Area Control Error calculation and in the event of
a dual A-C 1 and A-C 2 failure, would prevent the impact? - ANSWER VBUCC



What system does contain information related to transmission and ancillary services for
PJM Members? - ANSWER PJM OASIS

What is the language used by PJM and PJM Members as the language for all
communications between them and shall issue operating instructions in a clear,
concise, and definite manner? - ANSWER English

True or False?

Jetstream is a data system used to connect remote assets and PJM to satisfy real time
market and other data transactions. - ANSWER True

What is utilized at LSCs and Marketing Centers to input transmission reservations and
utilized by PJM to output Available Transmission Capacity, energy transactions,
transmission congestion information, and approved transmission reservation requests?
- ANSWER OASIS



True or False?



PJM Member's computer system availability and data reliability its control center
facilities shall provide an environment that is suitable for its equipment and personnel,
but does not have to consider the hottest and coldest outdoor temperatures. - ANSWER
False



All Market Participants must be able to respond to telephone questions about their

,scheduled transactions within how many minutes of a call initiation by PJM? - ANSWER
One minute



What is the scan frequency for external tie line primary metering? ANSWER 4 seconds
or less



What does provide a data archive of operational data in near-real-time? ANSWER Data
Historian System



What has two markets, a day-ahead market and a real-time balancing market? -
ANSWER Two-Settlement System



True or False?



True, The PJM EMS performs the real-time monitoring and security analysis and
generation control functions for the entire PJM region.



The scan frequency for generation dispatch data through the EMS data link or Markets
gateway is which of the following? - ANSWER 10 seconds or less



What is the system used for data entry, storage, and reporting of generating unit
information related to outages, unit performance and fuel performance? ANSWER eRPM



What are two major types of metering systems that are employed in the PJM RTO? -
ANSWER System Control and Monitoring, Billing



What does P JM utilize for providing to PJM RTO Transmission Providers and Customers
in order to provide information such as Available Transfer Capability and other
important transmission and ancillary services data? - ANSWER OASIS



What system do PJM operators use to call Transmission Owner Control Centers, Market

,Operations Centers, and Load Serving Centers individually or collectively for the
purpose of information exchange under both normal and emergency situations?
ANSWER All Call System



What is the system where the data are used in support of voltage stability, oscillation
monitoring and detection, situational awareness, the archival system, model analysis,
and as a Wide Area View? - ANSWER Synchrophasor



How many subsystems does the PJM EMS have? - ANSWER Four



True or False?



PJM defines a Tie Line as a physical circuit or dynamic transfer connecting two
balancing authority areas, control areas, or fully metered electric system regions. -
ANSWER True



PJM is responsible to perform which of the following for the PJM Forecasted load and
reserves not covered by the Day ahead demand bids, self-scheduled resources or
bilateral transactions? - ANSWER Scheduling



True or False?

PJM is an RTO. - ANSWER True



Who does eligibility include to submit offers and buy energy or related services in the
Day-ahead Energy Market and in the Real-time Energy Market, including Market Buyers
and Sellers? - ANSWER Only PJM Members



How many general types of Market Buyers are there? - ANSWER Two



What Market Buyer type is a buyer who is purchasing energy from the PJM Interchange
Energy Market for consumption by end-users inside the PJM RTO? - ANSWER Metered
Market Buyer

, What is also called a forward market in which hourly clearing prices are determined for
every hour of the forthcoming operating day to basis generation offers, demand bids,
increment offers, decrement bids and bilateral transaction schedules? - ANSWER
Day-ahead Market



What is also referred to as the real time energy market whereby the clearing prices are
determined every five minutes based on actual system operations security-constrained
economic dispatch? - ANSWER Balancing Market



Who can submit hourly demand schedules, including any price sensitive demand, for the
quantity of demand that they want to lock-in at Day-ahead prices? - ANSWER Load
Serving Entities



What is the marginal price for energy at the location where the energy is delivered or
received? - ANSWER Locational Marginal Price (LMP)



At what time does the Day-ahead market bid period close? - ANSWER 11:00



At what time does PJM posts day-ahead hourly schedules and LMPs in the Markets
Gateway System, based on the first resource commitment? - ANSWER 13:30



At what time does the Balancing Market offer period close? - ANSWER 14:15



True or False?

Market Buyers can submit increment offers or decrement bids at any hub, transmission
zone, aggregate, single bus or eligible external interface point for which an LMP is
calculated. - ANSWER True



Generation owners planning to run generation resources scheduled in the Day-ahead
Markets are required to call the PJM Control Center at least how soon prior to bringing
the unit online? - ANSWER 20 minutes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Easton West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
501
Member since
2 year
Number of followers
221
Documents
21802
Last sold
3 days ago

3.9

111 reviews

5
53
4
21
3
21
2
7
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions