100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM Exam Questions And 100% Correct Answers A+ Graded

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
13-10-2024
Written in
2024/2025

PJM Exam Questions And 100% Correct Answers A+ Graded...

Institution
PJM
Course
PJM









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
October 13, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Exam Questions And 100% Correct
Answers A+ Graded

What is the threshold to have a satellite phone? - ANSWER 500 MW



How often is reactive testing done? - ANSWER 5 years



Which of the following would NOT be a reason for an abrupt deviation in the balancing
area ACE?



1) Error in interchange number

2) Loss of a tie-line RTU

3) Loss of internal load

4) Loss of adjacent control area generation - ANSWER Loss of adjacent control area
generation



Any fuel shortage that may be experienced by a generator should be made known to
PJM. This information is used in the analysis resources and operates the system in a
reliable way. An increased awareness is expected during: - ANSWER Extreme hot or
cold conditions



If a fossil steam unit has less than 32 hours of fuel at max capacity it should be bid at :-
ANSWER Maximum Emergency



A tie line with MW flowing into the PJM control area trips. The system operator will see
which of the following occur?



1) Ace will decrease, frequency will decrease

, 2) ACE will increase, frequency will increase

3) ACE will decrease, frequency will remain the same

4) ACE and frequency will remain the same - ANSWER ACE and frequency will remain
the same



What is PJM's regulation requirement during

a system restoration? - ANSWER 2% of current load



What is the longest duration of outages that can be scheduled during the PJM Peak
Period Maintenance season? - ANSWER 9 Days



Maximum emergency generation is declared by PJM when which of the following
occurs? - ANSWER 20 MVA



When a data link is down, what is the update frequency to PJM? - ANSWER 30 minutes
or agreed upon change



What must be done before taking a self scheduled unit out of service? - ANSWER Give
PJM option to take over the unit for the market



What is the purpose of an exciter? - ANSWER Control voltage by controlling VARs



The mechanical device on a transformer that controls deviation in voltage is called?



1) Primary winding

2) AVR

3) Load tap changer - ANSWER LTC: Load Tap Changer



Operating reserve must be equal to the sum of: - ANSWER 1) Spinning

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Easton West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
501
Member since
2 year
Number of followers
221
Documents
21802
Last sold
3 days ago

3.9

111 reviews

5
53
4
21
3
21
2
7
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions